1.5 MW Hospital Power System Cost Breakdown (Q3 2026 China Supplier Pricing)

1.5 MW Hospital Power System Cost Breakdown (Q3 2026 China Supplier Pricing) — itemized bill of materials and FOB pricing for a typical configuration.

Last updated: 2026-09-12 · copper-linked items track the daily LME copper price

Estimated total (FOB): $310,667 · 1600 kVA transformer

Bill of materials

ItemSpecificationQtyPrice (USD)
HV incoming panel (KYN28A-12-630-315)630 A / 31.5 kA · vacuum2$4,896
HV bus-tie panel (KYN28A-12-630-315)630 A / 31.5 kA · vacuum1$2,448
Main transformer (each) (SCB13-1600/10)1600 kVA · Dry-Type · Copper · SCB132$53,534
LV incoming panel (GGD-2500)2500 A busbar · In 2309 A2$12,310
LV bus-tie panel (GGD-2500)2500 A busbar1$6,155
LV feeder panel (×3) (GGD-2500)distributes 13 circuits3$18,464
Cable branch box (LV) (DFW-0.4)1-in / 4-out · 0.4 kV · 630 A3$1,890
Main feeder cable (TX→LV) (YJV 0.6/1kV 300 mm² ×5)5× 300 mm² Cu · ΔU 0.90% @ 60 m · $154.0/m5$46,200
Feeder cable — Ward 1 (×13) (YJV 70 mm²)70 mm² Cu · 175 A · ΔU 1.5% · $37.0/m13$28,860
Branch trunk cable (LV → branch box 1) (YJV 185 mm² ×2)2× 185 mm² Cu · 701 A · ΔU 1.1% · $103.0/m2$12,360
Branch trunk cable (LV → branch box 2) (YJV 185 mm² ×2)2× 185 mm² Cu · 701 A · ΔU 1.1% · $103.0/m2$12,360
Branch trunk cable (LV → branch box 3) (YJV 70 mm²)70 mm² Cu · 175 A · ΔU 1.5% · $37.0/m1$2,220
Main busbar (Cu) (Cu 125×10)125×10 · 2500 A rating · ref $147.8/mincludedPOA
Grounding electrode (Φ20mm × 2.5m rod)R₁ 39.6 Ω → 13 rod(s) ≤ 4 Ω13$125
Automatic transfer switch (ATS) (ATS 600 A (typ.))dual-source automatic transfer · GB 50052 load classification1$845
Emergency power supply (EPS) (225 kW (typ.))emergency & fire lighting · GB 513091$13,000
Diesel generator set (standby) (2000 kVA (typ.))standby power for life-safety & critical loads · GB 500161$95,000
Medical IT isolated power supply (45 kVA)operating theatre / ICU isolated power · IEC 60364-7-7101POA
Operating-room UPS (online) (75 kVA)online double-conversion · IEC 62040 · quoted per project1POA
Fire pump feeder (dedicated) (120 kW)dedicated fire pump supply · GB 500161POA

Single-line diagram

CTCT50/5150/5187differentialFeed AFeed BKYN28A-12-630-315KYN28A-12-630-315HV bus-tieSCB13-1600/101600 kVA - Z=6%SCB13-1600/101600 kVA - Z=6%LV bus-tie0.4 kV0.4 kVWard 1 - 175 AYJV 70 mm2Ward 2 - 175 AYJV 70 mm2Ward 3 - 175 AYJV 70 mm2Ward 4 - 175 AYJV 70 mm2Ward 5 - 175 AYJV 70 mm2Ward 6 - 175 AYJV 70 mm2Ward 7 - 175 AYJV 70 mm2Ward 8 - 175 AYJV 70 mm2Ward 9 - 175 AYJV 70 mm2Ward 10 - 175 AYJV 70 mm2Ward 11 - 175 AYJV 70 mm2Ward 12 - 175 AYJV 70 mm2Ward 13 - 175 AYJV 70 mm2Grounding 13xdia20mmx2.5m rod
LEGENDBreaker (52)DisconnectorCTCT (current transformer)PTPT (voltage transformer)50/51Protection relay 50/51/51N/87kWhMeter (kWh)SPD (surge protection)Transformer

How it was calculated

What drives the cost

  • Equipment — the transformer/switchgear/inverter is the largest single line item.
  • Storage (where applicable) — batteries are the biggest swing factor.
  • Copper & freight — copper-linked cabling and freight shift landed cost ±5–10%.

Frequently asked questions

What redundancy do hospitals require for power supply?
Hospitals are first-class important loads under GB 50052 and need two independent utility supplies plus an emergency source (diesel or EPS) that restores critical circuits in seconds. Life-support and operating rooms use 2N topology with UPS. The calculator models building type, redundancy (N+1/2N) and emergency level to size the full plant.
How is emergency power restored in public buildings?
An automatic transfer switch (ATS) detects supply loss and transfers to a standby diesel generator, which starts and reaches full load in 30-60 seconds. For millisecond-critical loads, a UPS bridges the gap. GB 50052 classifies the emergency level; the calculator sizes ATS, diesel/EPS and battery backup per the building's load class.
What is the typical load density of a hospital or stadium?
Hospitals run 60-120 W/m2 (up to 150 W/m2 with imaging), schools 30-60 W/m2, offices 50-80 W/m2, and stadiums 60-100 W/m2 plus floodlighting peaks. The calculator's 1500 kW default models a mid-size hospital; total demand sets the transformer and emergency ratings.
What transformer size does a 1500 kW hospital need?
A 1500 kW hospital at 0.95 pf needs about 1580 kVA, so select 2x800 kVA or 2x1000 kVA for N+1/2N redundancy. Hospitals often run two transformers with automatic bus-tie so either can carry critical load. The calculator selects standard IEC 60076 ratings and applies the chosen redundancy level.
What is an EPS and how does it differ from a UPS?
An emergency power supply (EPS) is an inverter-based backup for lighting and life-safety loads, transferring within 0.25-5 seconds — slower than a UPS (0-10 ms) but cheaper per kVA and built for motor and lighting duty. UPS serves electronics that cannot tolerate any interruption. The calculator selects EPS for emergency lighting and UPS for critical IT.
What power quality rules apply to public buildings?
Public buildings must limit harmonic distortion per IEEE 519 (5-8% THD at PCC) and maintain power factor above ~0.9 to avoid utility penalties. LED lighting and VFD HVAC drives inject harmonics, so detuned capacitors or APFs are common. The calculator checks pf and harmonic share and sizes compensation accordingly.