One-Stop Supply of Conventional & Solar Power Equipment · Power Distribution System Design

Oil-Immersed Transformer Price List – Q3 2026 China Supplier Prices

Oil-Immersed Transformer — EXW / FOB Qingdao reference prices.

Last updated: 2026-09-12 · copper-linked

Copper-wound items are linked to the daily LME copper price (base ≈ $14,213.965/t, current $14,218.55/t). Copper-wound prices above are shown at today's copper price and refresh with the daily copper update.
Small ratings (below the 100 kVA list minimum). Prices for 10–80 kVA are obtained by extrapolating this list's own capacity-price curve backwards (P = P₁₀₀ × (S/100)^b, b fitted between the first and last published rating, clamped to 0.55–1.0). Unit price rises as the rating falls — tank, bushings, tap changer and routine-test cost are largely independent of capacity. The configurator (qdtb-transformer.com/configurator) uses exactly the same model, so the two never disagree.
Voltage class changes the price. 34.4 / 34.5 kV designs belong to the 36 kV insulation system (Um = 40.5 kV, 40.5 kV-class switchgear) and are priced with the 35 kV-class coefficient — currently +35% against the 10 kV class at the same kVA rating, before any impedance / vector-group / cooling premium. Do not compare a 34.5 kV quotation with a 10 kV one line-for-line.

S9 COPPER — per kVA

Capacity (kVA)Price (USD)
10$546
15$712
20$860
25$996
30$1,122
40$1,356
50$1,570
63$1,827
80$2,138
100$2,475
160$3,178
200$3,603
315$4,769
400$5,721
500$6,682
630$8,306
800$9,572
1000$10,612
1250$13,001

S9 ALUMINUM — per kVA

Capacity (kVA)Price (USD)
10$350
15$449
20$536
25$614
30$687
40$820
50$941
63$1,084
80$1,255
100$1,440
160$1,817
200$2,008
315$2,620
400$3,085
500$3,584
630$4,350
800$5,071
1000$5,801
1250$6,798

S11 COPPER — per

Capacity (unit)Price (USD)
10$460
15$626
20$777
25$920
30$1,056
40$1,313
50$1,554
63$1,850
80$2,216
100$2,623
200$3,819
315$5,055
500$7,083
630$8,804
800$10,146
1000$11,250
1600$17,252
2000$21,135
3150$31,951
5000$48,646
6300$60,028

S11 ALUMINUM — per

Capacity (unit)Price (USD)
10$340
15$443
20$534
25$618
30$696
40$840
50$971
63$1,129
80$1,319
100$1,526
200$2,128
315$2,777
500$3,799
630$4,611
800$5,375
1000$6,149
1600$8,588
2000$10,064
3150$13,899
5000$19,302
6300$22,748

S13 COPPER — per

Capacity (unit)Price (USD)
10$487
15$661
20$822
25$973
30$1,116
40$1,387
50$1,642
63$1,955
80$2,342
100$2,772
200$4,035
315$5,341
500$7,484
630$9,302
800$10,720
1000$11,886
1600$18,228
2000$22,331
3150$33,760
5000$51,399
6300$63,426

S13 ALUMINUM — per

Capacity (unit)Price (USD)
10$359
15$468
20$565
25$653
30$736
40$888
50$1,026
63$1,193
80$1,395
100$1,613
200$2,249
315$2,934
500$4,014
630$4,872
800$5,680
1000$6,497
1600$9,074
2000$10,634
3150$14,686
5000$20,394
6300$24,035

S20 COPPER — per

Capacity (unit)Price (USD)
10$587
15$797
20$990
25$1,172
30$1,345
40$1,672
50$1,979
63$2,356
80$2,823
100$3,341
200$4,865
315$6,437
500$9,021
630$11,213
800$12,922
1000$14,327
1600$21,971
2000$26,917
3150$40,692
5000$61,954
6300$76,452

S20 ALUMINUM — per

Capacity (unit)Price (USD)
10$433
15$564
20$681
25$787
30$887
40$1,070
50$1,237
63$1,438
80$1,681
100$1,944
200$2,711
315$3,537
500$4,838
630$5,872
800$6,846
1000$7,831
1600$10,937
2000$12,817
3150$17,701
5000$24,582
6300$28,971

S22 COPPER — per

Capacity (unit)Price (USD)
10$673
15$915
20$1,137
25$1,346
30$1,545
40$1,920
50$2,272
63$2,706
80$3,241
100$3,836
200$5,585
315$7,391
500$10,357
630$12,874
800$14,837
1000$16,449
1600$25,226
2000$30,905
3150$46,721
5000$71,133
6300$87,778

S22 ALUMINUM — per

Capacity (unit)Price (USD)
10$497
15$648
20$781
25$904
30$1,018
40$1,228
50$1,420
63$1,651
80$1,930
100$2,232
200$3,112
315$4,061
500$5,555
630$6,742
800$7,860
1000$8,992
1600$12,558
2000$14,716
3150$20,324
5000$28,224
6300$33,263

What drives the price

  • Capacity / rating — price scales sub-linearly with rating; unit cost falls as capacity rises.
  • Material & winding — aluminium windings cut cost 15–25% versus copper but raise load losses.
  • Efficiency grade — higher efficiency classes cost more up front but cut no-load loss.
  • Certification & tests — CE/CB/UL and third-party witness tests add cost and lead time.
  • Copper price — copper-wound units track the daily LME copper price.

Frequently asked questions

Is this price list final or indicative?
These are EXW / FOB Qingdao reference prices, updated to reflect current material and copper costs. A firm quote requires a formal enquiry with your exact specifications and quantity.
What is the lead time?
Standard units ship in 4–8 weeks; custom configurations, certifications and third-party inspection add 1–3 weeks.
Do prices include freight and import duty?
No — prices are EXW/FOB Qingdao. Freight, insurance, import duty and local delivery are additional.
Is there a bulk discount?
Yes — tender/bulk quantities qualify for tiered pricing. Send an enquiry for a firm quotation.
How does the copper price affect the price?
Copper-wound items track the daily LME copper price; a ±10% copper move shifts cost roughly ±5–7%.

Request a firm quote

Send your specifications and quantity for a formal quotation.

Request a Quote Size & price your own

Related