One-Stop Supply of Conventional & Solar Power Equipment · Power Distribution System Design

1.5MW 医院供电系统(2026年第三季度中国供应商价格)

1.5 MW Hospital Power System Cost Breakdown (Q3 2026 China Supplier Pricing) — itemized bill of materials and FOB pricing for a typical configuration.

Last updated: 2026-09-12 · copper-linked items track the daily LME copper price

Estimated total (FOB): $310,667 · 1600 kVA transformer

Bill of materials

ItemSpecificationQtyPrice (USD)
HV incoming panel (KYN28A-12-630-315)630 A / 31.5 kA · vacuum2$4,896
HV bus-tie panel (KYN28A-12-630-315)630 A / 31.5 kA · vacuum1$2,448
Main transformer (each) (SCB13-1600/10)1600 kVA · Dry-Type · Copper · SCB132$53,534
LV incoming panel (GGD-2500)2500 A busbar · In 2309 A2$12,310
LV bus-tie panel (GGD-2500)2500 A busbar1$6,155
LV feeder panel (×3) (GGD-2500)distributes 13 circuits3$18,464
Cable branch box (LV) (DFW-0.4)1-in / 4-out · 0.4 kV · 630 A3$1,890
Main feeder cable (TX→LV) (YJV 0.6/1kV 300 mm² ×5)5× 300 mm² Cu · ΔU 0.90% @ 60 m · $154.0/m5$46,200
Feeder cable — Ward 1 (×13) (YJV 70 mm²)70 mm² Cu · 175 A · ΔU 1.5% · $37.0/m13$28,860
Branch trunk cable (LV → branch box 1) (YJV 185 mm² ×2)2× 185 mm² Cu · 701 A · ΔU 1.1% · $103.0/m2$12,360
Branch trunk cable (LV → branch box 2) (YJV 185 mm² ×2)2× 185 mm² Cu · 701 A · ΔU 1.1% · $103.0/m2$12,360
Branch trunk cable (LV → branch box 3) (YJV 70 mm²)70 mm² Cu · 175 A · ΔU 1.5% · $37.0/m1$2,220
Main busbar (Cu) (Cu 125×10)125×10 · 2500 A rating · ref $147.8/mincludedPOA
Grounding electrode (Φ20mm × 2.5m rod)R₁ 39.6 Ω → 13 rod(s) ≤ 4 Ω13$125
Automatic transfer switch (ATS) (ATS 600 A (typ.))dual-source automatic transfer · GB 50052 load classification1$845
Emergency power supply (EPS) (225 kW (typ.))emergency & fire lighting · GB 513091$13,000
Diesel generator set (standby) (2000 kVA (typ.))standby power for life-safety & critical loads · GB 500161$95,000
Medical IT isolated power supply (45 kVA)operating theatre / ICU isolated power · IEC 60364-7-7101POA
Operating-room UPS (online) (75 kVA)online double-conversion · IEC 62040 · quoted per project1POA
Fire pump feeder (dedicated) (120 kW)dedicated fire pump supply · GB 500161POA

Single-line diagram

CTCT50/5150/5187differentialFeed AFeed BKYN28A-12-630-315KYN28A-12-630-315HV bus-tieSCB13-1600/101600 kVA - Z=6%SCB13-1600/101600 kVA - Z=6%LV bus-tie0.4 kV0.4 kVWard 1 - 175 AYJV 70 mm2Ward 2 - 175 AYJV 70 mm2Ward 3 - 175 AYJV 70 mm2Ward 4 - 175 AYJV 70 mm2Ward 5 - 175 AYJV 70 mm2Ward 6 - 175 AYJV 70 mm2Ward 7 - 175 AYJV 70 mm2Ward 8 - 175 AYJV 70 mm2Ward 9 - 175 AYJV 70 mm2Ward 10 - 175 AYJV 70 mm2Ward 11 - 175 AYJV 70 mm2Ward 12 - 175 AYJV 70 mm2Ward 13 - 175 AYJV 70 mm2Grounding 13xdia20mmx2.5m rod
LEGENDBreaker (52)DisconnectorCTCT (current transformer)PTPT (voltage transformer)50/51Protection relay 50/51/51N/87kWhMeter (kWh)SPD (surge protection)Transformer

How it was calculated

成本敏感因素

  • 设备 — 变压器/开关柜/逆变器是最大单项。
  • 储能 — 电池是最大变量。
  • 铜价与运费 — 铜价联动线缆与运费使到岸成本 ±5–10% 波动。

常见问题

医院供电需要什么冗余?
医院按 GB 50052 属一级重要负荷,需两路独立市电加应急电源(柴发或 EPS),数秒内恢复关键回路。生命维持和手术室用 2N + UPS。计算器按建筑类型、冗余等级(N+1/2N)与应急级别为整套供配电选型。
公共建筑的应急电源如何恢复?
双电源自动转换开关(ATS)检测失电后切到备用柴油发电机,柴发 30-60 秒启动并带满负荷。毫秒级关键负荷用 UPS 桥接。GB 50052 划分应急等级;计算器按建筑负荷类别选 ATS、柴发/EPS 与电池备电。
医院或体育场的典型负荷密度是多少?
医院约 60-120 W/m²(含影像可达 150 W/m²),学校 30-60 W/m²,办公 50-80 W/m²,体育场 60-100 W/m² 外加泛光照明峰值。计算器默认 1500 kW 模拟中型医院;总需量决定变压器与应急容量。
1500 kW 医院需要多大变压器?
1500 kW 医院、0.95 功率因数约需 1580 kVA,故 N+1/2N 选 2×800 kVA 或 2×1000 kVA。医院常设两台变压器带自动母联,任一都能带关键负荷。计算器按 IEC 60076 标准容量并套用所选冗余等级。
什么是 EPS?它和 UPS 有什么区别?
应急电源(EPS)是基于逆变器的照明和生命安全负荷备用电源,切换时间 0.25-5 s,比 UPS(0-10 ms)慢但每 kVA 更便宜,适合电机与照明负荷。UPS 用于不能容忍任何中断的电子设备。计算器为应急照明选 EPS、为关键 IT 选 UPS。
公共建筑适用哪些电能质量规定?
公共建筑须按 IEEE 519 限制谐波畸变(PCC 处 5-8% THD)并维持功率因数高于约 0.9 以免被罚款。LED 照明和变频暖通注入谐波,故常配去谐电容或 APF。计算器校核功率因数与谐波占比并配置补偿。

计算你自己的配置

输入你的实际负荷,获得完整 BOM 与 FOB 报价。

Open calculator Request a Quote

相关页面