100kW 光储充一体化系统(2026年第三季度中国供应商价格)
100 kW PV + Storage + EV Charging System Cost Breakdown (Q3 2026 China Supplier Pricing) — itemized bill of materials and FOB pricing for a typical configuration.
Estimated total (FOB): POA
Bill of materials
| Item | Specification | Qty | Price (USD) |
|---|---|---|---|
| PV modules | 100 kWp · 4.5 kWh/m²/day site | 1 | $11,000 |
| PV inverter | 100 kW | 1 | $4,500 |
| Battery energy storage (LFP) | 200 kWh | 1 | $16,000 |
| PCS (power conversion system) | 50 kW | 1 | $2,500 |
| AC charger (22 kW) | 22 kW | 1 | $630 |
| AC charger (7 kW) | 7 kW | 2 | $440 |
| AC charger (7 kW) | 7 kW | 1 | $220 |
How it was calculated
- ['PV yield', '100 kW × 4.5 kWh/m²/day × 365 × 0.8 = 131,400 kWh/yr']
- ['Autonomy', '200 kWh ÷ 42 kW = 4.8 h']
- ['CAPEX', 'PV $11,000 + inverter $4,500 + storage $16,000 + PCS $2,500 + chargers $1,290 = $35,290']
- ['Annual benefit', 'self-consumption 85% of PV at $0.15 + export at $0.04 + storage arbitrage']
- ['Economics', 'full-cost: CAPEX + discounted O&M + battery/inverter replacement (degradation 0.5%/yr) over 25 yr @ 8% WACC → NPV +$164,989, payback 2 yr']
成本敏感因素
- 设备 — 变压器/开关柜/逆变器是最大单项。
- 储能 — 电池是最大变量。
- 铜价与运费 — 铜价联动线缆与运费使到岸成本 ±5–10% 波动。
常见问题
如何设计光伏+储能+充电一体化系统?
从日负荷入手:光伏容量覆盖白天负荷并给电池充电,电池覆盖夜间和高峰,EV 充电是额外的强同时性负荷。100 kW 光伏 + 200 kWh 储能 + 6-10 个充电桩是常见工商业配置。配置器匹配三者容量并输出 BOM 与经济性。
什么是削峰填谷?储能如何实现?
削峰填谷是在低电价或光伏高发时段给电池充电、在高峰时段放电,以降低需量电费和网购电量。对需量电价 10 美元/kW·月的工商业用户,削 200 kW 峰值可年省 2.4 万美元。配置器按削峰策略选电池容量并量化节省。
EV 充电如何改变储能选型?
EV 充电是陡峭的晚高峰负荷,常与尖峰电价重合,故储能要配更大以服务充电并避免需量尖峰。120 kW 快充可拉 120 kVA,10 桩站点峰值近 500-1200 kVA。配置器把充电负荷加入削峰模型并据此选 BESS。
工商业储能用什么电池化学体系?
磷酸铁锂(LFP)因安全性、循环寿命(80% DoD 下 6000+ 次)和成本主导工商业储能,对比能量密度更高但热稳定性差的 NMC。LFP 往返效率约 90-95%。配置器按 IEC 62619 对 LFP 集装箱/柜式系统报价。
光伏+储能+充电项目的回收期是多少?
在高电价和需量电费地区,一体化工商业项目典型 4-7 年回本,收益来自省电费、降需量费和充电服务收入。配置器根据你的电价、辐照和负荷曲线计算全成本经济性——LCOE、回收期、IRR 与 NPV。
光伏+储能+充电适用哪些电网标准?
EV 充电遵循 IEC 61851 与 GB/T 51313;储能系统安全遵循 IEC 62619/IEC 62933 与 GB/T 36547;光伏并网遵循 GB/T 19964 与 IEEE 1547。配置器在设计依据中引用这些标准并选合规设备。