Sistema de armazenamento de energia comercial de 50 kW / 100 kWh
Um típico PCS de 50 kW com conjunto de baterias de 100 kWh para redução de pico comercial e backup.
Lista de materiais
| Equipment | Model | Specification | Qty | Price |
|---|---|---|---|---|
| PCS (Power Conversion System) | — | 30kW | 1 | Cotação em tempo real |
| LiFePO4 Battery Cluster | — | 768V 100kWh 240S1P / 95% DoD / ~6,000 cycles | 1 | Cotação em tempo real |
| BMS | — | cluster-level active | 1 | Cotação em tempo real |
| ESS Prefab Enclosure | — | QDTB enclosure | 1 | Cotação em tempo real |
| Fire Suppression | — | 3-level Novec1230 | 1 | Cotação em tempo real |
| EMS / Monitoring | — | peak-shaving | 1 | Cotação em tempo real |
| AC Cable | — | YJV 4x50 | 40 | Cotação em tempo real |
Os preços exatos são calculados em tempo real pela seleção instantânea e calculadora de cotação — insira seus parâmetros reais para obter uma cotação FOB precisa.
Etapas de projeto
1. Storage power: 50kW x 0.6 = 30 kW (PCS 30kW)
2. Storage capacity: max(30kWx2h, 100kWhx0.3) = 100 kWh (240S1P)
3. Battery life: ~6,000 cycles @ 95% DoD
4. Duration: ~ 3.3 h
5. Storage arbitrage (illustrative): usable 95 kWh/day × spread $0.060/kWh × 365 = $2,081/yr
6. Payback / IRR: 19.7 yr · IRR -10.8% (indicative, 10-yr life)
Notas de projeto
Pricing basis: BOM shows FOB equipment price (ex-works). Economic figures (LCOE/IRR/payback/DSCR) use an estimated turnkey cost that adds typical freight/duty and EPC/installation/soft costs — see Economic basis.
Payback period: ≈ 19.7 yr simple payback at $0.12/kWh tariff (full-cost basis).
Levelized cost (LCOE): $0.0989/kWh full-cost over a 25-year life (O&M + WACC + inverter replacement + module degradation included).
Battery life: 100 kWh at 95% DoD ≈ 6,000 cycles (~16 yr of daily cycling).
Storage duration: ≈ 3.3 h at rated PCS power — sized for peak-shaving / backup.
Note: Final system design must be confirmed by a licensed local engineer against site conditions and local grid codes.
Economic basis (indicative): Storage-only economics: indicative peak–valley arbitrage (spread = 50% of average tariff $0.12/kWh, 1 cycle/day, 95% DoD, 10-yr life). Not a bankable financing model.
Diagrama Unifilar
Esquema Elétrico
Projete e cote este sistema em tempo real
Insira seus parâmetros de carga reais para obter a lista exata de equipamentos e o preço FOB.