QDTB® Transformatör

50 kW / 100 kWh Ticari Enerji Depolama Sistemi

Ticari zirve azaltma ve yedekleme için 100 kWh pil kümesine sahip tipik 50 kW PCS.

Malzeme Listesi

EquipmentModelSpecificationQtyPrice
PCS (Power Conversion System)30kW1Gerçek zamanlı teklif
LiFePO4 Battery Cluster768V 100kWh 240S1P / 95% DoD / ~6,000 cycles1Gerçek zamanlı teklif
BMScluster-level active1Gerçek zamanlı teklif
ESS Prefab EnclosureQDTB enclosure1Gerçek zamanlı teklif
Fire Suppression3-level Novec12301Gerçek zamanlı teklif
EMS / Monitoringpeak-shaving1Gerçek zamanlı teklif
AC CableYJV 4x5040Gerçek zamanlı teklif

Kesin fiyatlar, anlık seçim ve teklif hesaplayıcıyla gerçek zamanlı olarak hesaplanır; kesin bir FOB teklifi için gerçek parametrelerinizi girin.

Tasarım adımları

1. Storage power: 50kW x 0.6 = 30 kW (PCS 30kW)
2. Storage capacity: max(30kWx2h, 100kWhx0.3) = 100 kWh (240S1P)
3. Battery life: ~6,000 cycles @ 95% DoD
4. Duration: ~ 3.3 h
5. Storage arbitrage (illustrative): usable 95 kWh/day × spread $0.060/kWh × 365 = $2,081/yr
6. Payback / IRR: 19.7 yr · IRR -10.8% (indicative, 10-yr life)

Tasarım notları

Pricing basis: BOM shows FOB equipment price (ex-works). Economic figures (LCOE/IRR/payback/DSCR) use an estimated turnkey cost that adds typical freight/duty and EPC/installation/soft costs — see Economic basis.
Payback period: ≈ 19.7 yr simple payback at $0.12/kWh tariff (full-cost basis).
Levelized cost (LCOE): $0.0989/kWh full-cost over a 25-year life (O&M + WACC + inverter replacement + module degradation included).
Battery life: 100 kWh at 95% DoD ≈ 6,000 cycles (~16 yr of daily cycling).
Storage duration: ≈ 3.3 h at rated PCS power — sized for peak-shaving / backup.
Note: Final system design must be confirmed by a licensed local engineer against site conditions and local grid codes.
Economic basis (indicative): Storage-only economics: indicative peak–valley arbitrage (spread = 50% of average tariff $0.12/kWh, 1 cycle/day, 95% DoD, 10-yr life). Not a bankable financing model.

Tek Hat Şeması

BATTERY100 kWhDCPCS30kWGRID/LOAD 400VLEGENDBreakerCTCT (current transformer)PTPT (voltage transformer)50/51Relay 50/51/51NkWhMeter (kWh)SPD (surge protection)

Elektrik Şeması

SYSTEM ELECTRICAL SCHEMATIC - C&I ENERGY STORAGE (PCS)1 - BATTERY2 - DC SIDE3 - PCS4 - AC SIDE5 - GRID / LOAD6 - EMS + FIRE7 - EARTHING / PE100 kWhHV clusterFuseDC BkrDC SPDbidir DC/DCPCS 3-PHASE BRIDGE (30 kW)LC filterBreakerGRID / LOAD400Visolation TXEMS + FireNovec1230 - RS485EMS / fire suppression commsPE bus battery racks - PCS - transformer - SPDs

Bu Sistemi Gerçek Zamanlı Olarak Tasarlayın ve Teklif Alın