Système solaire résidentiel hors réseau de 5 kW
Un système solaire hors réseau typique de 5 kW avec stockage par batterie pour un usage résidentiel.
Nomenclature
| Equipment | Model | Specification | Qty | Price |
|---|---|---|---|---|
| PV Modules | — | 550Wp Mono | 12 | Devis en temps réel |
| Hybrid Inverter | — | 5kW LV | 1 | Devis en temps réel |
| LiFePO4 Battery Pack | — | 51.2V 15kWh 16S1P / 90% DoD / ~8,000 cycles | 1 | Devis en temps réel |
| BMS | — | 16S active balance | 1 | Devis en temps réel |
| Battery Cabinet | — | QDTB enclosure | 1 | Devis en temps réel |
| PV Mounting (rooftop) | — | 6.5kWp · tilt 25.9° | 1 | Devis en temps réel |
| DC Cable PV1-F 4mm² | — | ΔU 0.5% @ 30m | 18 | Devis en temps réel |
| MC4 Connector | — | male/female pair | 14 | Devis en temps réel |
| DC Surge Protector | — | 40kA 1000V | 2 | Devis en temps réel |
| Monitoring Module | — | WiFi/4G APP | 1 | Devis en temps réel |
| Mounting Accessories | — | clamps/bolts/earthing | 12 | Devis en temps réel |
Les prix exacts sont calculés en temps réel par le calculateur de sélection et de devis instantané — entrez vos paramètres réels pour un devis FOB précis.
Étapes de conception
1. PV capacity: max(5kWx1.3, 10kWhx1.5/(4hx0.8)) = 6.5 kWp
2. Battery: 10kWh x 1d / 90% DoD / 95% = 15 kWh (16S1P)
3. Battery life: ~8,000 cycles @ 90% DoD
4. String design: 1 strings x ~12 modules (temp-corrected 3-18/string)
5. DC voltage drop: 0.5% (PV1-F 4mm², 30m run)
6. Mounting: tilt 25.9° · row spacing 3.4m
7. Performance ratio (PR): 0.98 soiling x 0.97 mismatch x 0.98 wiring x 0.975 inverter x 0.92 temp = 0.836
8. Inverter: hybrid 5kW
9. LCOE (full-cost): $0.1426/kWh over 25 yr (O&M + WACC + inverter replacement + degradation)
10. Turnkey cost: FOB 3,709 → installed 8,308 (50% soft + 12% landing)
11. Payback / IRR / NPV: 12.2 yr · IRR 5.9% · NPV $-1,415 · DSCR 0.92
Notes de conception
Pricing basis: BOM shows FOB equipment price (ex-works). Economic figures (LCOE/IRR/payback/DSCR) use an estimated turnkey cost that adds typical freight/duty and EPC/installation/soft costs — see Economic basis.
Payback period: ≈ 12.2 yr simple payback at $0.12/kWh tariff (full-cost basis).
Levelized cost (LCOE): $0.1426/kWh full-cost over a 25-year life (O&M + WACC + inverter replacement + module degradation included).
String design: 1 strings × ~12 modules/string — temp-corrected Vmp/Voc stay within the inverter MPPT window ✓
DC voltage drop: ΔU 0.5% < 2% ✓ (4mm² PV1-F, 30m run).
Mounting: Tilt 25.9° optimized for the site latitude; row spacing 3.4m avoids winter shading.
Battery life: 15 kWh at 90% DoD ≈ 8,000 cycles (~22 yr of daily cycling).
Note: Final system design must be confirmed by a licensed local engineer against site conditions and local grid codes.
Economic basis (indicative): Turnkey cost = FOB equipment + interconnection + landing (freight/duty 12%) + EPC/installation/BOS/soft costs (50% of installed). Pre-tax, year-1 DSCR, indicative only — not a bankable financing model.
Diagramme unifilaire
Schéma électrique
Concevoir et devis ce système en temps réel
Entrez vos paramètres de charge réels pour obtenir la liste exacte des équipements et le prix FOB.