Estimated total (FOB): $382,021 · 2000 kVA transformer
Bill of materials
| Item | Specification | Qty | Price (USD) |
|---|---|---|---|
| HV incoming panel (KYN28A-12-630-315) | 630 A / 31.5 kA · vacuum | 2 | $4,896 |
| HV bus-tie panel (KYN28A-12-630-315) | 630 A / 31.5 kA · vacuum | 1 | $2,448 |
| Main transformer (each) (S13-M-2000/10) | 2000 kVA · Oil-Immersed · Copper · S13 | 2 | $44,662 |
| LV incoming panel (GGD-3150) | 3150 A busbar · In 2887 A | 2 | $14,450 |
| LV bus-tie panel (GGD-3150) | 3150 A busbar | 1 | $7,225 |
| LV feeder panel (×2) (GGD-3150) | distributes 10 circuits | 2 | $14,450 |
| Cable branch box (LV) (DFW-0.4) | 1-in / 4-out · 0.4 kV · 630 A | 2 | $1,260 |
| Busway trunking (LV main feeder) (Busway 4000 A) | 4000 A · Cu/Al busway · 80 m · $1329/m | 1 | $106,320 |
| Feeder cable — Process feeder 1 (×10) (YJV 150 mm²) | 150 mm² Cu · 304 A · ΔU 1.6% · $86.0/m | 10 | $68,800 |
| Branch trunk cable (LV → branch box 1) (YJV 240 mm² ×3) | 3× 240 mm² Cu · 1215 A · ΔU 1.3% · $123.0/m | 3 | $29,520 |
| Branch trunk cable (LV → branch box 2) (YJV 150 mm² ×2) | 2× 150 mm² Cu · 608 A · ΔU 1.6% · $86.0/m | 2 | $13,760 |
| Main busbar (Cu) (Cu 125×10) | 125×10 · 2500 A rating · ref $147.8/m | included | POA |
| Grounding electrode (Φ20mm × 2.5m rod) | R₁ 39.6 Ω → 13 rod(s) ≤ 4 Ω | 13 | $125 |
| Detuned PFC capacitor bank (221 kvar) | automatic · 7% detuned · 0.4 kV | 1 | $3,300 |
| Series detuning reactor (7%) (15.5 kvar) | 189 Hz tuning · below 5th harmonic | 1 | $804 |
| Explosion-proof (Ex) distribution board (Ex d Zone 2) | Flameproof enclosure · IEC 60079 · quoted per project (POA — not included in estimate) | 1 | POA |
| Ex-rated motor control center (MCC) (Ex d Zone 2) | Ex motor starters + VFD for pumps/compressors · IEC 60079 (POA — not included in estimate) | 1 | POA |
| Emergency / standby diesel generator (1000 kVA) | life-safety / standby power · 600 kVA required | 1 | $70,000 |
Single-line diagram
How it was calculated
- Continuous process load = 2,000 kW (N-1 continuity)
- Redundancy N+1 → 2 transformers + bus-tie (100% backup)
- Rectifier harmonic source: 400 kW · THDi 25% → Ih = 770 × 25% = 192 A
- Detuned filter: Qc = 400 × (tanφ₁ − tanφ₂) = 221 kvar · 7% reactor (f_res 189 Hz)
- Resonance check: 5th harmonic 250 Hz above 189 Hz → detuned (safe)
- Loads: P=2,000 kW, PF 0.95, 10 circuits
- Demand: 2,000 × 0.85 = 1,700 kW
- PFC: Qc = 1,700 × (0.329 − 0.329) = 0 kVAR → 0 kVAR bank
- Transformer: S = 1,700 ÷ 0.95 = 1789.5 kVA → 2,000 kVA standard
- Loading: 1,789 ÷ 2,000 = 89% (good range)
- Voltage regulation: 89% × 4% × sinφ ≈ 1.1% at full load
- HV: In 115.5 A, Isc 28.9 kA → KYN28A-12-630-315
成本敏感因素
- 设备 — 变压器/开关柜/逆变器是最大单项。
- 储能 — 电池是最大变量。
- 铜价与运费 — 铜价联动线缆与运费使到岸成本 ±5–10% 波动。
常见问题
防爆(Ex)区域划分对电气设备意味着什么?
危险区按爆炸性气体(IEC 60079 的 Zone 0/1/2)或粉尘(Zone 20/21/22)出现的概率划分。Zone 1/2 内的电气设备须有与气体组别和温度等级匹配的 Ex 认证(如 Ex d、Ex e、Ex n)。正确选 Ex 等级会使开关柜成本增加 20-50%;计算器可选分区并标注 Ex 型 BOM。
石化厂为什么需要双电源供电?
连续流程装置(炼油、乙烯、合成氨)不能承受失电——重新开车可能需数天并损失数百万。按 GB 50052 负荷分级,关键负荷采用双路独立电源 + 自动转换(ATS)和 N+1 或 2N 冗余。计算器可设冗余等级并据此配置应急/备用回路。
石化厂的整流装置谐波如何处理?
电解和电镀整流器注入 5、7、11 次谐波。若公共连接点总谐波畸变超过 IEEE 519 限值(多数系统为 5% THD),需加装去谐电容器组(7% 串联电抗)或有源滤波器(APF)。计算器在 THDi 超过约 15-20% 时按 7% 去谐系数配置补偿。
石化中低压变压器典型阻抗是多少?
石化厂配电变压器阻抗通常 6%(uk),大型电机回路有时用 8% 以限制短路电流。阻抗越高短路电流越小但电压调整率越差,6% 对 10/0.4 kV、1000-2500 kVA 单元可兼顾两者。计算器计算故障水平时采用标准 uk 值。
GB 50052 对连续生产负荷如何分级?
GB 50052 将负荷分为一、二、三级。连续石化装置属一级负荷,需两路独立电源;关键安全负荷(紧急停车、消防泵)属『一级重要负荷』,还需柴发或 EPS 等应急电源。计算器的冗余与应急电源选项即对应这些分级。
炼厂工艺负荷的需用系数怎么定?
炼厂工艺负荷近乎连续运行,主装置需用系数高达 0.8-0.9,公用与辅助系统 0.6-0.7。2000 kW 装机工艺负荷、0.85 需用系数、0.95 功率因数约需 1790 kVA,取 2000 kVA 变压器。计算器用这些系数避免超配与欠配。