Système PV sur toit commercial de 100 kW
Un système PV de toit typique de 100 kW relié au réseau pour les installations commerciales et industrielles.
Nomenclature
| Equipment | Model | Specification | Qty | Price |
|---|---|---|---|---|
| PV Modules | — | 550Wp Mono | 219 | Devis en temps réel |
| String Inverter | — | 100kW | 1 | Devis en temps réel |
| DC Combiner Box | — | 9 inputs | 1 | Devis en temps réel |
| DC Distribution Panel | — | QDTB | 1 | Devis en temps réel |
| PV Mounting | — | color-steel / flat roof · tilt 25.9° | 1 | Devis en temps réel |
| DC Cable PV1-F 6mm² | — | ΔU 0.2% @ 30m | 263 | Devis en temps réel |
| MC4 Connector | — | male/female pair | 237 | Devis en temps réel |
| AC Cable | — | YJV 4x50 | 90 | Devis en temps réel |
| Cable Tray | — | hot-dip galvanized | 30 | Devis en temps réel |
| DC Surge Protector | — | 40kA 1000V | 4 | Devis en temps réel |
| Protection Relay | — | OC/instantaneous/anti-islanding | 1 | Devis en temps réel |
| SCADA Monitoring | — | plant-level | 1 | Devis en temps réel |
| Earthing System | — | flat bar + rods | 1 | Devis en temps réel |
| AC Distribution Panel | View product | GCK draw-out | 1 | Devis en temps réel |
| Grid-Tie Panel | View product | protection/metering | 1 | Devis en temps réel |
| LV Capacitor Bank | View product | 100kvar | 1 | Devis en temps réel |
Les prix exacts sont calculés en temps réel par le calculateur de sélection et de devis instantané — entrez vos paramètres réels pour un devis FOB précis.
Étapes de conception
1. PV capacity: 100kW x 1.2 = 120.0 kWp
2. Inverter: 100kW (parallel)
3. String design: 9 strings x ~25 modules (temp-corrected 6-27/string)
4. DC voltage drop: 0.2% (PV1-F 6mm², 30m run)
5. Mounting: tilt 25.9° · row spacing 3.4m
6. Performance ratio (PR): 0.98 soiling x 0.97 mismatch x 0.98 wiring x 0.987 inverter x 0.92 temp = 0.846
7. Output current: ~ 144A (3-ph 400V)
8. Interconnection: LV 400V
9. LCOE (full-cost): $0.0677/kWh over 25 yr (O&M + WACC + inverter replacement + degradation)
10. Turnkey cost: FOB 38,056 → installed 73,488 (42% soft + 12% landing)
11. Payback / IRR / NPV: 5.3 yr · IRR 17.9% · NPV $66,161 · DSCR 2.10
Notes de conception
Pricing basis: BOM shows FOB equipment price (ex-works). Economic figures (LCOE/IRR/payback/DSCR) use an estimated turnkey cost that adds typical freight/duty and EPC/installation/soft costs — see Economic basis.
Payback period: ≈ 5.3 yr simple payback at $0.12/kWh tariff (full-cost basis).
Levelized cost (LCOE): $0.0677/kWh full-cost over a 25-year life (O&M + WACC + inverter replacement + module degradation included).
String design: 9 strings × ~25 modules/string — temp-corrected Vmp/Voc stay within the inverter MPPT window ✓
DC voltage drop: ΔU 0.2% < 2% ✓ (6mm² PV1-F, 30m run).
Mounting: Tilt 25.9° optimized for the site latitude; row spacing 3.4m avoids winter shading.
Grid interconnection: LV 400V direct grid-tie.
Note: Final system design must be confirmed by a licensed local engineer against site conditions and local grid codes.
Economic basis (indicative): Turnkey cost = FOB equipment + interconnection + landing (freight/duty 12%) + EPC/installation/BOS/soft costs (42% of installed). Pre-tax, year-1 DSCR, indicative only — not a bankable financing model.
Diagramme unifilaire
Schéma électrique
Concevoir et devis ce système en temps réel
Entrez vos paramètres de charge réels pour obtenir la liste exacte des équipements et le prix FOB.