10 MW Industrial Park Power System Cost Breakdown (Q3 2026 China Supplier Pricing)

10 MW Industrial Park Power System Cost Breakdown (Q3 2026 China Supplier Pricing) — itemized bill of materials and FOB pricing for a typical configuration.

Last updated: 2026-09-12 · copper-linked items track the daily LME copper price

Bill of materials

This configuration exceeds the standard single-transformer catalogue range (max ≈ 6300 kVA). It is engineered to order — contact us for a custom multi-transformer design and quotation. No standard BOM is shown to avoid misleading figures.

What drives the cost

  • Equipment — the transformer/switchgear/inverter is the largest single line item.
  • Storage (where applicable) — batteries are the biggest swing factor.
  • Copper & freight — copper-linked cabling and freight shift landed cost ±5–10%.

Frequently asked questions

What demand factor applies to an industrial park?
An industrial park with many factories never runs every machine simultaneously; a demand factor of 0.55-0.7 is typical. A 2000 kW connected load at 0.6 kd and 0.9 pf gives ~1330 kVA demand, so a 1600 kVA transformer or two 800 kVA units suit. The calculator uses demand factor and motor share to size the MV/LV plant.
How much harmonic filtering does a factory-heavy park need?
When 60% of load is motors on VFDs and 25% is non-linear (rectifiers, UPS), THDi can reach 15-25%. IEEE 519 limits THD to 5-8% at the point of common coupling, so a detuned capacitor bank (7% reactor) or APF is required. The calculator sizes compensation and detuning from the harmonic share.
What is the standard MV/LV architecture for an industrial park?
Typical architecture: 10 kV (or 35 kV) utility feed -> ring or radial MV switchgear -> one transformer per factory or block -> 0.4 kV switchboards -> motor control centers. A 10 kV ring with RMUs along the ring offers N-1 supply. The calculator sizes the transformers, switchgear and compensation for the aggregated park load.
How do I allocate transformer capacity per factory?
Give each factory its own transformer sized to its demand plus 20-25% headroom, or share one large transformer for small tenants. Separate transformers isolate faults and simplify metering, but shared units cost less. The calculator aggregates the park demand and shows the single-transformer and split-transformer options.
What power factor should an industrial park maintain?
Utilities usually require 0.9-0.95 power factor and levy penalties below ~0.9. Industrial parks with motor-heavy load typically start at 0.75-0.85 and add capacitor banks to reach 0.95. The calculator computes the required kvar compensation to correct from measured pf to target and sizes the LV capacitor bank.
What redundancy does a park MV network usually provide?
A ring-main MV network with normally-open tie provides N-1 redundancy: any cable or RMU fault is isolated and load restored from the other direction. Radial feeders are cheaper but lose supply on a fault. The calculator's architecture notes cover ring vs radial options and their reliability trade-off.