800 kW Industrial Park Power System Cost Breakdown (Q3 2026 China Supplier Pricing)

800 kW Industrial Park Power System Cost Breakdown (Q3 2026 China Supplier Pricing) — itemized bill of materials and FOB pricing for a typical configuration.

Last updated: 2026-09-12 · copper-linked items track the daily LME copper price

Estimated total (FOB): $80,036 · 630 kVA transformer

Bill of materials

ItemSpecificationQtyPrice (USD)
HV incoming panel (KYN28A-12-630-315)630 A / 31.5 kA · vacuum1$2,448
Main transformer (S13-M-630/10)630 kVA · Oil-Immersed · Copper · S131$9,302
LV incoming panel (GGD-1000)1000 A busbar · In 909 A1$3,479
LV feeder panel (GGD-1000)distributes 4 circuits1$3,479
Main feeder cable (TX→LV) (YJV 0.6/1kV 300 mm² ×2)2× 300 mm² Cu · ΔU 1.18% @ 80 m · $154.0/m2$24,640
Feeder cable — Plant feeder 1 (×4) (YJV 185 mm²)185 mm² Cu · 352 A · ΔU 1.5% · $103.0/m4$32,960
Main busbar (Cu) (Cu 80×8)80×8 · 1400 A rating · ref $75.6/mincludedPOA
Grounding electrode (Φ20mm × 2.5m rod)R₁ 39.6 Ω → 13 rod(s) ≤ 4 Ω13$125
Detuned PFC capacitor bank (177 kvar)automatic · 7% detuned · 0.4 kV1$2,800
Series detuning reactor (7%) (12.4 kvar)189 Hz tuning · below 5th harmonic1$804

Single-line diagram

CTCT 40/5APTPT 10kV/100V50/5151NHV incomingKYN28A-12-630-315630 A / 31.5 kA - vacuumS13-M-630/10630 kVAZ = 4%Oil-Immersed - Copper - S13kWhmeteringLV incomingGGD-10000.4 kV LV busbar80x8 Cu - 1400 ASPDLV feeder panel x1 - 4 circuitsPlant feeder 1 - 352 AYJV 185 mm2Plant feeder 2 - 352 AYJV 185 mm2Plant feeder 3 - 352 AYJV 185 mm2Plant feeder 4 - 352 AYJV 185 mm2Grounding 13xdia20mmx2.5m rod
LEGENDBreaker (52)DisconnectorCTCT (current transformer)PTPT (voltage transformer)50/51Protection relay 50/51/51N/87kWhMeter (kWh)SPD (surge protection)Transformer

How it was calculated

What drives the cost

  • Equipment — the transformer/switchgear/inverter is the largest single line item.
  • Storage (where applicable) — batteries are the biggest swing factor.
  • Copper & freight — copper-linked cabling and freight shift landed cost ±5–10%.

Frequently asked questions

What demand factor applies to an industrial park?
An industrial park with many factories never runs every machine simultaneously; a demand factor of 0.55-0.7 is typical. A 2000 kW connected load at 0.6 kd and 0.9 pf gives ~1330 kVA demand, so a 1600 kVA transformer or two 800 kVA units suit. The calculator uses demand factor and motor share to size the MV/LV plant.
How much harmonic filtering does a factory-heavy park need?
When 60% of load is motors on VFDs and 25% is non-linear (rectifiers, UPS), THDi can reach 15-25%. IEEE 519 limits THD to 5-8% at the point of common coupling, so a detuned capacitor bank (7% reactor) or APF is required. The calculator sizes compensation and detuning from the harmonic share.
What is the standard MV/LV architecture for an industrial park?
Typical architecture: 10 kV (or 35 kV) utility feed -> ring or radial MV switchgear -> one transformer per factory or block -> 0.4 kV switchboards -> motor control centers. A 10 kV ring with RMUs along the ring offers N-1 supply. The calculator sizes the transformers, switchgear and compensation for the aggregated park load.
How do I allocate transformer capacity per factory?
Give each factory its own transformer sized to its demand plus 20-25% headroom, or share one large transformer for small tenants. Separate transformers isolate faults and simplify metering, but shared units cost less. The calculator aggregates the park demand and shows the single-transformer and split-transformer options.
What power factor should an industrial park maintain?
Utilities usually require 0.9-0.95 power factor and levy penalties below ~0.9. Industrial parks with motor-heavy load typically start at 0.75-0.85 and add capacitor banks to reach 0.95. The calculator computes the required kvar compensation to correct from measured pf to target and sizes the LV capacitor bank.
What redundancy does a park MV network usually provide?
A ring-main MV network with normally-open tie provides N-1 redundancy: any cable or RMU fault is isolated and load restored from the other direction. Radial feeders are cheaper but lose supply on a fault. The calculator's architecture notes cover ring vs radial options and their reliability trade-off.