Système de distribution pour bâtiments commerciaux de 1 250 kVA

1600 kVA · SCB13-1600/10

Un système de distribution par transformateur de type sec typique de 1 250 kVA pour les bâtiments commerciaux et les centres de données.

Nomenclature

EquipmentModelSpecificationQtyPrice
HV incoming panelKYN28A-12-630-315630 A / 31.5 kA · vacuum1Devis en temps réel
Main transformerSCB13-1600/101600 kVA · Dry-Type · Copper · SCB131Devis en temps réel
LV incoming panelGGD-25002500 A busbar · In 2309 A1Devis en temps réel
LV feeder panel (×2)GGD-2500distributes 8 circuits2Devis en temps réel
PFC capacitor bank400 kVARautomatic · GCK LV cabinet1Devis en temps réel
Cable branch box (LV)DFW-0.41-in / 4-out · 0.4 kV · 630 A1Devis en temps réel
Series reactor (detuned)CKSG-24.0/0.424.0 kVAR · 6% · 0.4 kV1Devis en temps réel
Main feeder cable (TX→LV)YJV 0.6/1kV 300 mm² ×55× 300 mm² Cu · ΔU 0.90% @ 60 m · $154.0/m5Devis en temps réel
Feeder cable — LV feeder circuit 1 (×8)YJV 240 mm²240 mm² Cu · 361 A · ΔU 0.9% · $123.0/m8Devis en temps réel
Branch trunk cable (LV → branch box 1)YJV 240 mm² ×44× 240 mm² Cu · 1443 A · ΔU 0.9% · $123.0/m4Devis en temps réel
Main busbar (Cu)Cu 125×10125×10 · 2500 A rating · ref $147.8/mincludedDevis en temps réel
Grounding electrodeΦ20mm × 2.5m rodR₁ 39.6 Ω → 13 rod(s) ≤ 4 Ω13Devis en temps réel

Les prix exacts sont calculés en temps réel par le calculateur de sélection et de devis instantané — entrez vos paramètres réels pour un devis FOB précis.

Étapes de conception

1. Loads: P=1,700 kW, PF 0.85, 8 circuits
2. Demand: 1,700 × 0.7 = 1,190 kW
3. PFC: Qc = 1,190 × (0.620 − 0.329) = 346 kVAR → 400 kVAR bank
4. Transformer: S = 1,190 ÷ 0.95 = 1252.6 kVA → 1,600 kVA standard
4b. Loading: 1,253 ÷ 1,600 = 78% (good range)
4c. Voltage regulation: 78% × 6% × sinφ ≈ 1.5% at full load
5. HV: In 92.4 A, Isc 28.9 kA → KYN28A-12-630-315
6. LV: In 2309 A, Isc 36.5 kA (Xfmr Z 6% + system 0.3%) → GGD-2500, 2 feeder panel(s)
6b. Cable branch boxes: 1 × DFW-0.4 (1-in/4-out) for feeder grouping
7. Grounding: R₁ 39.6 Ω → 13 rod(s)
8. Main feeder: 5× 300 mm² · ΔU 0.90% — OK

Notes de conception

Pricing basis: FOB Qingdao (EXW) equipment price. Freight, duty and installation are not included — add for landed economics.
Transformer loading: 78% at design demand — good range.
Short-circuit check: HV 28.9 kA vs 31.5 kA (1.1× margin) · LV 36.5 kA vs 50 kA (1.4× margin).
Voltage regulation: ≈ 1.5% at full load (typical limit 5%).
Power factor correction: 400 kVAR automatic bank corrects PF to 0.95.
Copper price linkage: Copper-wound transformer price tracks LME copper (current $14,219/t · 2026-09-12 · LME Copper (Sina hf_CAD)).
Parallel conductors: Single-cable ampacity exceeded — parallel conductors specified: main feeder 5× 300 mm², branch trunk 1 4× 240 mm² (per IEC 60364-5-52 / GB 50054).
Cable & grounding pricing: Cable conductors and grounding are priced from the confirmed cables-trays-grounding price reference (per-metre copper YJV; aluminium remains POA). The main copper busbar is POA — its length is project-specific.
Busway (high-current feeders): For LV feeders above ~2500 A, a busway (母线槽) trunking system is recommended instead of parallel cables.

Diagramme unifilaire

CTCT 100/5APTPT 10kV/100V50/5151NHV incomingKYN28A-12-630-315630 A / 31.5 kA - vacuumSCB13-1600/101600 kVAZ = 6%Dry-Type - Copper - SCB13kWhmeteringLV incomingGGD-25000.4 kV LV busbar125x10 Cu - 2500 ASPDPFC 400 kVAR+ detuned reactorLV feeder panel x2 - 8 circuitsLV feeder circuit 1 - 361 AYJV 240 mm2LV feeder circuit 2 - 361 AYJV 240 mm2LV feeder circuit 3 - 361 AYJV 240 mm2LV feeder circuit 4 - 361 AYJV 240 mm2LV feeder circuit 5 - 361 AYJV 240 mm2LV feeder circuit 6 - 361 AYJV 240 mm2LV feeder circuit 7 - 361 AYJV 240 mm2LV feeder circuit 8 - 361 AYJV 240 mm2Grounding 13xdia20mmx2.5m rodCable branch box DFW-0.4 x1 (1-in / 4-out)
LEGENDBreaker (52)DisconnectorCTCT (current transformer)PTPT (voltage transformer)50/51Protection relay 50/51/51N/87kWhMeter (kWh)SPD (surge protection)Transformer

Concevoir et devis ce système en temps réel

Entrez vos paramètres de charge réels pour obtenir la liste exacte des équipements et le prix FOB.