Konfigurator PV + Penyimpanan + Pengisian EV
Konfigurasikan sistem fotovoltaik + penyimpanan baterai + pengisian EV terintegrasi — pencocokan kapasitas, strategi operasi, dan ekonomi biaya penuh dalam satu alat.
Untuk pengembang dan EPC yang merancang sistem terintegrasi PV + penyimpanan + pengisian EV (konsumsi sendiri, peak shaving, atau off-grid).
Gunakan kalkulator
Contoh perhitungan
Contoh referensi yang telah dihitung sebelumnya (dapat dirayapi — tidak memerlukan JavaScript). Masukkan parameter Anda sendiri di atas untuk hasil langsung.
Contoh perhitungan — 200 kW PV + 400 kWh penyimpanan + 120 kW EV, terhubung jaringan
| Quantity | Value |
|---|---|
| PV capacity | 200 kW |
| Charging load | 120 kW |
| PV : load ratio | 1.67 (PV ≥ load — self-sufficient by day) |
| Storage autonomy | 400 kWh ÷ 120 kW = 3.3 h |
| PV annual yield | 200 × 4.5 × 365 × 0.8 = 262,800 kWh/yr |
| Charging annual energy | 120 kW × 6 h × 365 = 262,800 kWh/yr |
| Component | Value |
|---|---|
| Initial CAPEX | POA |
| Annual O&M (1%/yr) | POA/yr |
| Battery replacement (yr 10) | POA |
| Inverter replacement (yr 15) | POA |
| Net present value (NPV) | POA |
| Simple payback | 3 years |
| Equipment | Spec | Qty | Subtotal |
|---|---|---|---|
| PV modules | 200 kWp · 4.5 kWh/m²/day site | 1 | POA |
| PV inverter | 200 kW | 1 | POA |
| Battery energy storage (LFP) | 400 kWh | 1 | POA |
| PCS (power conversion system) | 125 kW | 1 | POA |
| DC fast charger (120 kW) | 120 kW | 1 | POA |
| Total CAPEX | POA |
Contoh perhitungan — 100 kW PV + 200 kWh penyimpanan + 60 kW EV, off-grid
| Quantity | Value |
|---|---|
| PV capacity | 100 kW |
| Charging load | 60 kW |
| PV : load ratio | 1.67 (PV ≥ load — self-sufficient by day) |
| Storage autonomy | 200 kWh ÷ 60 kW = 3.3 h |
| PV annual yield | 100 × 4 × 365 × 0.8 = 116,800 kWh/yr |
| Charging annual energy | 60 kW × 6 h × 365 = 131,400 kWh/yr |
| Component | Value |
|---|---|
| Initial CAPEX | POA |
| Annual O&M (1%/yr) | POA/yr |
| Battery replacement (yr 10) | POA |
| Inverter replacement (yr 15) | POA |
| Net present value (NPV) | POA |
| Simple payback | 3 years |
| Equipment | Spec | Qty | Subtotal |
|---|---|---|---|
| PV modules | 100 kWp · 4 kWh/m²/day site | 1 | POA |
| PV inverter | 100 kW | 1 | POA |
| Battery energy storage (LFP) | 200 kWh | 1 | POA |
| PCS (power conversion system) | 60 kW | 1 | POA |
| DC fast charger (60 kW) | 60 kW | 1 | POA |
| Total CAPEX | POA |
Cara perhitungannya
- · Hasil tahunan PV: E = P × GHI × 365 × PR.
- · Otonomi penyimpanan: h = baterai kWh ÷ beban pengisian kW.
- · Ekonomi biaya penuh: CAPEX + O&M terdiskonto (1%/tahun) + penggantian baterai/inverter, dengan degradasi PV 0.5%/tahun, didiskontokan pada WACC selama umur proyek.
- · Nilai peak-shaving: baterai kWh × siklus/tahun × DoD × efisiensi round-trip × (tarif puncak − lembah).
Standar yang dirujuk
| Standard | Scope |
|---|---|
| IEC 61851 | Sistem pengisian konduktif kendaraan listrik |
| GB/T 19964 | Koneksi jaringan pembangkit listrik PV (Tiongkok) |
| GB/T 36547 | Koneksi jaringan sistem penyimpanan energi elektrokimia (Tiongkok) |
| IEC 62933 | Sistem penyimpanan energi listrik |
Pertanyaan yang sering diajukan
How do I size a PV + storage + EV charging system?
Start from daily load: PV capacity covers daytime demand plus battery charging; the battery covers night and peak periods; EV charging adds a large coincident load. A 100 kW PV with 200 kWh storage and 6-10 chargers is a common C&I configuration. The configurator matches PV, BESS and charging capacity and reports the bill of materials and economics.
What is peak-shaving and how does storage enable it?
Peak-shaving charges the battery during low-price or high-PV periods and discharges during peak-price hours to reduce demand charges and grid imports. For a commercial site with a $10/kW monthly demand charge, cutting 200 kW of peak can save $24,000/yr. The configurator sizes the battery for the shaving strategy and quantifies the saving.
How does EV charging change the storage sizing?
EV charging is a sharp evening load that often coincides with peak tariffs, so storage is sized larger to serve it and avoid demand spikes. A 120 kW fast charger can draw 120 kVA; a 10-charger station peaks near 500-1200 kVA. The configurator adds charging load to the peak-shaving model and sizes BESS accordingly.
What battery chemistry is used for C&I energy storage?
LFP (lithium iron phosphate) dominates C&I storage for safety, cycle life (6,000+ cycles at 80% DoD) and cost, versus NMC which offers higher energy density but lower thermal stability. LFP round-trip efficiency is ~90-95%. The configurator prices LFP-based container and cabinet systems per IEC 62619.
What is the payback of a PV + storage + charging project?
Integrated C&I projects typically pay back in 4-7 years where tariffs and demand charges are high, driven by avoided energy cost, demand-charge reduction and EV charging revenue. The configurator computes full-cost economics — LCOE, payback, IRR and NPV — from your tariff, irradiation and load profile.
What grid standards apply to PV + storage + charging?
EV charging follows IEC 61851 and GB/T 51313; energy storage system safety follows IEC 62619/IEC 62933 and GB/T 36547; PV grid connection follows GB/T 19964 and IEEE 1547. The configurator cites these standards in its design basis and selects compliant equipment.
Sematkan kalkulator ini
Tambahkan kalkulator ini ke situs web Anda sendiri secara gratis. Iframe menyesuaikan dengan lebar apa pun dan berjalan sepenuhnya di browser pengunjung Anda.
Alat terkait
Perkiraan referensi (FOB Qingdao, EXW) hanya untuk desain awal — bukan penawaran final. Konfirmasi ukuran terhadap proyek Anda dan standar setempat.
Send my complete design report
Get the full bill of materials, single-line diagram, calculation steps and FOB pricing as a PDF — free, no sign-up.
Your data stays private. No spam — only a reply to your enquiry.