QDTB®变压器官网

50 kW / 100 kWh Commercial Energy Storage System

A typical 50 kW PCS with 100 kWh battery cluster for commercial peak-shaving and backup.

Bill of Materials

EquipmentModelSpecificationQtyPrice
PCS (Power Conversion System)30kW1Real-time quote
LiFePO4 Battery Cluster768V 100kWh 240S1P / 95% DoD / ~6,000 cycles1Real-time quote
BMScluster-level active1Real-time quote
ESS Prefab EnclosureQDTB enclosure1Real-time quote
Fire Suppression3-level Novec12301Real-time quote
EMS / Monitoringpeak-shaving1Real-time quote
AC CableYJV 4x5040Real-time quote

Exact prices are calculated in real time by the instant selection and quote calculator — enter your actual parameters for a precise FOB quote.

Design Steps

1. Storage power: 50kW x 0.6 = 30 kW (PCS 30kW)
2. Storage capacity: max(30kWx2h, 100kWhx0.3) = 100 kWh (240S1P)
3. Battery life: ~6,000 cycles @ 95% DoD
4. Duration: ~ 3.3 h
5. Storage arbitrage (illustrative): usable 95 kWh/day × spread $0.060/kWh × 365 = $2,081/yr
6. Payback / IRR: 19.7 yr · IRR -10.8% (indicative, 10-yr life)

Design Notes

Pricing basis: BOM shows FOB equipment price (ex-works). Economic figures (LCOE/IRR/payback/DSCR) use an estimated turnkey cost that adds typical freight/duty and EPC/installation/soft costs — see Economic basis.
Payback period: ≈ 19.7 yr simple payback at $0.12/kWh tariff (full-cost basis).
Levelized cost (LCOE): $0.0989/kWh full-cost over a 25-year life (O&M + WACC + inverter replacement + module degradation included).
Battery life: 100 kWh at 95% DoD ≈ 6,000 cycles (~16 yr of daily cycling).
Storage duration: ≈ 3.3 h at rated PCS power — sized for peak-shaving / backup.
Note: Final system design must be confirmed by a licensed local engineer against site conditions and local grid codes.
Economic basis (indicative): Storage-only economics: indicative peak–valley arbitrage (spread = 50% of average tariff $0.12/kWh, 1 cycle/day, 95% DoD, 10-yr life). Not a bankable financing model.

Single-Line Diagram

BATTERY100 kWhDCPCS30kWGRID/LOAD 400VLEGENDBreakerCTCT (current transformer)PTPT (voltage transformer)50/51Relay 50/51/51NkWhMeter (kWh)SPD (surge protection)

Electrical Schematic

SYSTEM ELECTRICAL SCHEMATIC - C&I ENERGY STORAGE (PCS)1 - BATTERY2 - DC SIDE3 - PCS4 - AC SIDE5 - GRID / LOAD6 - EMS + FIRE7 - EARTHING / PE100 kWhHV clusterFuseDC BkrDC SPDbidir DC/DCPCS 3-PHASE BRIDGE (30 kW)LC filterBreakerGRID / LOAD400Visolation TXEMS + FireNovec1230 - RS485EMS / fire suppression commsPE bus battery racks - PCS - transformer - SPDs

Design and Quote This System in Real Time

Enter your actual load parameters to get the exact equipment list and FOB price.