The answer first: partial discharge is the first measurable sign of insulation failure, and the pC limit in your purchase order is a contract number — not a diagnosis
Partial discharge (PD) is a tiny electrical spark inside insulation that never bridges the electrodes: picocoulombs of apparent charge, nanoseconds long, repeating thousands of times per second at operating stress. It is the earliest electrical symptom of a defect that would otherwise announce itself only through dissolved gas — and years later, through a failure. A limit of 10 pC measured at 1.1 Um/√3 is the figure most overseas tenders apply to oil-immersed units at 72.5 kV and above, while cast-resin distribution transformers are usually accepted at 10–20 pC; both numbers mean nothing unless the test voltage, the hold time, the background noise and the inception and extinction voltages are reported with them. A unit reading 8 pC that incepts at 0.6 Um is in more trouble than a unit reading 40 pC only above 1.2 Um, so a PD report has to be read as a curve and a pattern, not as the single figure printed on the last line.
Key takeaways
- pC is apparent charge, not defect charge. The meter sees what arrives at the measuring terminals, not what happens inside the winding: a 10 pC reading at the bushing can correspond to a discharge several times larger deep in the paper.
- Ask for three numbers plus two voltages. Limit, test voltage and hold time define whether the test is meaningful; inception voltage (PDIV) and extinction voltage (PDEV) define whether the defect will be active at normal operating stress.
- Hysteresis identifies the defect family. A wide PDIV–PDEV gap points to a void in solid insulation; a near-zero gap with jittery amplitude points to floating metal, a loose contact or external noise.
- PD is a condition indicator, not a lifetime passport. A unit that passed at 8 pC can read 300 pC a year later if the oil was topped up with wet oil or the hot spot ran at 120 °C.
- Specify PD after the impulse test too. The impulse test is where insulation damage is most often created; a PD reading taken only after the AC withstand will miss it.
What is partial discharge, and why does a spark that never bridges the gap still destroy insulation?
IEC 60270 defines partial discharge as a localised electrical discharge that only partially bridges the insulation between conductors. In a transformer that discharge almost always happens inside a gas-filled cavity: a void left in cast epoxy resin, a dry spot in oil-impregnated paper, a bubble under a lead insulation, or the gap between a floating metal particle and a winding surface. The gas in that cavity has a dielectric strength roughly one third to one tenth of the surrounding solid or liquid insulation, so the field concentrates there and the cavity breaks down long before the bulk insulation is anywhere near its withstand level.
Each individual event is small — of the order of a nanojoule to a few microjoules — but the damage is cumulative and chemical as much as electrical. In air-filled cavities the discharge converts oxygen into ozone and, with any moisture present, into nitric acid, both of which attack paper and resin. In oil-filled cavities the discharge cracks hydrocarbon molecules into hydrogen, methane and traces of acetylene, and deposits a brown polymer known as X-wax on the cavity walls. The eroded cavity grows, the field in it rises, the discharge repetition rate increases, and the process feeds itself until a tree channel reaches an electrode and the insulation punctures. This is why PD is treated as a defect detector rather than a dielectric strength test: the unit is not being asked to survive a voltage, it is being asked to reveal whether it is already being eaten from the inside.
| What one PD pulse does | Mechanism | What it leaves behind |
|---|---|---|
| Erodes the cavity wall | Ion bombardment and local heating in the discharge channel | Enlarged void, higher local stress, higher repetition rate |
| Chemically attacks paper and resin | Ozone and nitric acid formation in air; hydrogen and methane in oil | Embrittled paper, conductive X-wax deposits, reduced PDIV |
| Creates a tree channel | Successive discharges extend a hollow channel along the field direction | Electrical tree that eventually bridges the electrodes |
| Heats the local volume | Microsecond-scale temperature rise at the discharge site | Accelerated local ageing, gassing, pressure pulses in sealed units |
The important consequence for a buyer is that PD is measurable long before any conventional test fails. Insulation resistance, turns ratio and even the power-frequency withstand test can all pass on a unit that is discharging steadily at 200 pC, because the defect is local and the bulk insulation still holds. Dissolved gas analysis will eventually show it, but only after enough energy has been dissipated to saturate the oil — typically months of running. PD measurement is the only routine test that sees the defect while it is still small, which is why it appears in factory acceptance tests for high-voltage units and in pre-purchase surveys for ageing fleets.
Where does partial discharge start? Six defect sites that account for almost every transformer PD case
In factory and field work the same six locations recur. Knowing which one you are looking at decides whether the unit can be dried, filtered, repaired or must be replaced, because only two of the six are reversible.
| Defect site | How it forms | PD signature | How it is caught |
|---|---|---|---|
| Voids in cast epoxy resin (dry-type) | Incomplete vacuum casting, air entrained during gelation, delamination at the conductor-resin interface | Steady discharge from a low inception voltage, typically tens to hundreds of pC, strongly voltage-dependent (high tip-up) | Factory PD test per IEC 60076-11, tip-up ratio, later UHF or acoustic survey |
| Dry or gassy paper in oil | Inadequate drying before impregnation, moisture ingress through a leaking gasket, free gas from a bad oil fill | Scattered pulses that grow with moisture content and with temperature; hydrogen dominant in DGA | Moisture and oil quality tests, DGA trend, PD test at 1.1 Um/√3 |
| Sharp protrusions and poor electrostatic shielding | Burrs on leads, screw threads left exposed, missing or broken shielding on the tank wall and core frames | Large, unstable pulses phase-locked near the voltage peak; corona-like asymmetry in the pattern | PD test with phase-resolved display, UHF location, visual inspection at inspection openings |
| Floating metal particles | Machining debris, weld spatter and loose washers left in the tank; particles align with the field and bridge a gap | Intermittent bursts with wandering amplitude, no stable phase relationship, sensitive to vibration and oil flow | Oil particle count, acoustic survey, UHF; often clears after oil processing and flushing |
| Bushings | Moisture in oil-impregnated paper, partial vacuum or voids in resin-impregnated paper, cracked porcelain, contaminated sheds | PD confined to one terminal, external surface tracking at the flange, rising tan delta | Bushing PD and tan delta test per IEC 60137, infrared and UV imaging, partial discharge survey |
| Tap changer and bolted connections | Contact erosion, insufficient contact pressure, loose busbar joints, floating potential on an ungrounded screen | Bursts synchronous with tap operations or load changes, often with acetylene appearing in DGA before any electrical sign | DGA (acetylene), contact resistance measurement, thermography, dynamic resistance test |
The choice of insulation system decides which of these six sites you are exposed to in the first place: a cast-resin unit concentrates its risk in the resin-conductor interface, an oil-immersed unit in paper, oil and bushings. The trade-off between the two constructions is set out in oil-immersed vs dry-type transformers.
How is partial discharge measured in a transformer factory?
The reference method is the wideband apparent-charge measurement of IEC 60270. A coupling capacitor is connected to the terminal under test, a measuring impedance converts the current pulse into a voltage step, and a calibrated pulse generator injects a known charge before and after the measurement so that the reading can be traced back to picocoulombs. The transformer is energised through an induced-voltage test set at a frequency high enough to reach the required flux without saturating the core, typically 100–400 Hz, so the winding sees its full dielectric stress. The other windings are either grounded or left floating through a guard circuit depending on the connection under test, and the tank is grounded at a single point to avoid circulating currents that would swamp the measurement.
What does an acceptance sequence look like, step by step?
A practical acceptance sequence for an oil-immersed unit above 72.5 kV looks like this: measure the background noise with the test set energised but the unit disconnected (it must stay well below the acceptance limit, typically under 5 pC in a shielded test bay); raise the voltage to the induced withstand level and hold it for the specified time; reduce to about 1.1 Um/√3; hold for the agreed measuring period, commonly five minutes and up to sixty minutes for critical or generator-step-up units; then record PDIV and PDEV by raising and lowering the voltage slowly. Every one of those steps should appear in the report, with the calibration certificate attached.
| Method | What it measures | Strength | Limit |
|---|---|---|---|
| Apparent charge, IEC 60270 (wideband or narrowband) | Calibrated pC at the terminals | Traceable, quantitative, the contractual method | Needs a shielded bay and a de-energised unit; cannot locate the source inside the tank |
| UHF detection, 300 MHz to 3 GHz | Electromagnetic pulses from the discharge | Immune to most electrical noise, works on line, can locate by time-of-flight | Not calibrated in pC; sensitivity depends on sensor position and tank openings |
| Acoustic and ultrasonic, 20–300 kHz | Structure-borne sound from the discharge | Locates the source to within tens of centimetres with an array | Attenuated by the winding; blind to discharges deep in solid insulation |
| Dissolved gas analysis | Chemical by-products in the oil | Cheap, routine, shows long-term trend | Integrates all faults; lags the defect by weeks or months |
What PD limit should you write into the purchase order?
IEC 60076-3 sets PD limits for oil-immersed transformers with Um above 72.5 kV, measured during the induced-voltage test: 10 pC for units up to 170 kV and 5 pC above that. Below 72.5 kV the standard does not require a routine PD test at all, which is why distribution transformer tenders either omit PD or quote a buyer-specific figure. The table below shows the values QDTB sees in 2024–2026 tender documents and factory reports; the binding number is always the one in your contract, read together with the edition of the standard it cites.
| Unit | Um | Typical acceptance level | Measured at |
|---|---|---|---|
| Oil-immersed distribution transformer | ≤ 36 kV | Often not specified; when required, 20–50 pC | 1.1 Um/√3, 5 min |
| Oil-immersed, medium voltage | 72.5 kV | 10 pC | 1.1 Um/√3, 5 min |
| Oil-immersed, high voltage | 145 kV | 10 pC | 1.1 Um/√3, 5 min |
| Oil-immersed, extra high voltage | 245 kV and above | 5 pC | 1.1 Um/√3, 5–60 min |
| Cast-resin dry-type | ≤ 24 kV | 10 pC (some buyers accept 20 pC) | 1.1 Um/√3 |
| Cast-resin dry-type | 36 kV | 20 pC | 1.1 Um/√3 |
| Bushing, RIP or OIP | 36–245 kV | 5–10 pC | 1.05 Um/√3, per IEC 60137 |
Four things are worth writing into the specification beyond the number itself. First, the voltage at which the limit applies — a limit quoted without it is unenforceable, because PD falls steeply as the voltage is reduced and a supplier can always find a voltage where the unit complies. Second, the background noise level, since an unshielded test bay can read 20 pC of ambient noise and still be reported as a pass. Third, PDIV and PDEV, which tell you the margin between the defect and normal operating stress. Fourth, the remedy: re-test after corrective action, rejection, or a price adjustment — the same discipline described in the 14 data points that decide a transformer price.
Reading a PD test report: why 8 pC can be worse than 40 pC
Three phases of the same 2,000 kVA, 11 kV cast-resin unit can read 8, 40 and 12 pC and require three different decisions. What separates them is not the peak value but where the discharge starts, whether it stops when the voltage comes back down, and how it behaves as the voltage is raised.
| Reading at 1.1 Um/√3 | PDIV | PDEV | Tip-up ratio | Interpretation |
|---|---|---|---|---|
| Phase A: 8 pC | 1.25 Um | 1.15 Um | 1.1 | Clean. Discharge appears only above the test level and disappears on the way down; typical of a small test artefact at the lead exit. |
| Phase B: 40 pC | 1.30 Um | 1.20 Um | 1.0 | High reading with no activity at operating stress. Usually external corona from the test connections, not the winding. Investigate, then accept. |
| Phase C: 12 pC | 0.60 Um | 0.55 Um | 4.3 | Real defect. Active well below operating voltage, strongly non-linear with voltage; a void in the resin. Reject or re-cast. |
What are PDIV, PDEV and tip-up?
Tip-up is the ratio of apparent charge at the higher measuring voltage to that at a lower one, commonly 1.1 Um/√3 against 0.6 Um/√3. A void discharge grows faster than the applied voltage because the field inside the cavity rises non-linearly once the cavity is discharging, so a ratio above about 2 is a strong indication of a genuine internal defect; a ratio near 1 with a high absolute reading is more often noise, corona or a bad connection in the measuring circuit.
The phase-resolved pattern adds the second half of the diagnosis. Plot the pulses against the phase of the applied voltage and four shapes appear often enough to be diagnostic:
| Pattern | Shape of the cluster | Most likely cause |
|---|---|---|
| Void discharge | Two roughly symmetric clusters around 0° and 180°, similar amplitude, growing with voltage | Cavity inside solid insulation — cast resin, paper, bushing RIP |
| Corona | One asymmetric cluster near the voltage peak, large amplitude difference between half-cycles | Sharp point in air, exposed thread or burr, test connection |
| Surface discharge | Broad, asymmetric clusters spreading across the half-cycle | Tracking along an insulation surface, contaminated bushing shed |
| Floating potential | Erratic amplitude, no fixed phase, sometimes jumping between clusters | Loose metal part, ungrounded screen, poor joint |
This is also why a report that contains only a number is not worth accepting. Ask for the raw PDIV and PDEV, the tip-up, and the phase-resolved plot or at least a description of the pattern; the same 12 pC can mean "accept" or "reject" depending on which of the four shapes produced it.
What does partial discharge look like on a transformer that is already in service?
On site the electrical reference method is usually unavailable, because the unit cannot be taken out of service for an induced-voltage test. In practice three techniques carry the work, and they are complementary rather than alternatives.
Dissolved gas analysis is the first screen. PD in oil generates hydrogen and methane as its primary gases, with small amounts of acetylene once the discharge is energetic enough; the PD region of the Duval triangle is defined precisely by that hydrogen-methane dominance with low ethylene. A single sample proves little, but a hydrogen trend rising faster than the load and temperature history can explain is a strong signal, and it is the cheapest test in the toolbox — the interpretation method is set out in how to read DGA gas levels and catch a fault early.
UHF monitoring is the second. A sensor fitted to a dielectric window or the tank drain valve picks up the electromagnetic pulses from the discharge, and because the UHF band sits far above the switching and corona noise that dominates below 100 MHz, the measurement can run continuously with the unit on load. Two or three sensors allow time-of-flight location, so the operator learns not only that the unit is discharging but roughly where — phase A winding, tap changer compartment, or a bushing. A permanent UHF system for one power transformer is typically a USD 15,000–40,000 installation (industry experience values, 2024–2026), which is why it is normally reserved for generator step-up units, critical industrial feeders and units already showing gas activity.
Acoustic and ultrasonic surveys are the third. An array of contact or airborne sensors detects the sound of the discharge and triangulates it, usually to within tens of centimetres; the method is blind to defects buried deep inside a winding but excellent for locating surface tracking on bushings and discharges in the tap changer compartment. A one-off portable survey of a substation, covering a dozen units, is typically USD 3,000–8,000 including the report (industry experience values).
When PD is found: dry out, repair, rewind or replace?
The decision follows the defect site, not the pC value. Moisture and particles are reversible; a void in solid insulation and an eroded tap contact are not. The table gives the cost bands QDTB sees for 1,000–2,000 kVA class units in 2024–2026 (industry experience values, excluding transport and outage cost).
| Finding | Action | Typical cost | Expected outcome |
|---|---|---|---|
| PD driven by moisture, paper at 2–4% | On-site or factory dry-out, oil processing, vacuum impregnation where possible | USD 3,000–9,000 | PD usually falls by an order of magnitude; repeat measurement after 30 days |
| Floating particles in oil | Oil filtration, tank flush, re-processing, particle count verification | USD 2,000–6,000 | Often clear; if the source is a loose part, it returns and the unit must be opened |
| Bushing discharge | Replace the bushing set, re-test the unit | USD 1,500–4,000 plus labour | Immediate and reliable fix; bushings are the most common field-replaceable PD source |
| Void or tree in cast resin | No field repair — replace the winding or the unit | New unit: USD 12,000–25,000 for 1,000–2,000 kVA | Progressive defect; plan replacement before the next load peak |
| PD in paper insulation with acetylene present | Rewind or replace; do not re-energise without a plan | Rewind: USD 4,000–9,000 | Rewind restores insulation but not the core or tank; weigh against a new unit as described in repair, refurbish or replace at 25 years |
| Continuous monitoring instead of action | Permanent UHF plus DGA sampling every 3–6 months | USD 15,000–40,000 plus testing | Buys time on a critical unit; does not remove the defect |
The economic rule that holds up in practice is to compare the cost of the intervention with the cost of an unplanned outage, not with the price of the transformer. A 1,000 kVA unit serving a data hall or a continuous process can lose more revenue in one day of forced outage than the whole dry-out costs, which justifies acting on a 12 pC defect that a paper mill might reasonably monitor for another two years.
Five specification clauses that keep a PD test from becoming a warranty argument
Most PD disputes are not about the physics; they are about what the contract actually required. These five clauses close the gaps that appear most often in overseas projects.
- Tie the limit to a voltage and a duration. Write "not more than 10 pC at 1.1 Um/√3, sustained for 5 minutes, background noise below 5 pC" rather than "low partial discharge". A limit without a voltage can be satisfied by measuring at 0.5 Um.
- Require PDIV and PDEV in the report. Both are recorded during the same test at no extra cost, and they are the only indication of how much margin exists between the defect and normal operating stress. A unit with PDIV below 1.1 Um/√3 should not be accepted regardless of its reading at the measuring voltage.
- Demand the calibration record. Apparent-charge measurement is only traceable if a calibrated pulse generator was injected before and after the test; a report without calibration data is a number, not a measurement.
- Repeat the PD measurement after the lightning impulse test. The impulse test is where turn insulation is most often damaged, and PD measured only after the AC withstand will not see it. The same logic applies to switching impulse tests on extra-high-voltage units.
- Include the bushings and the tap changer in the scope. A transformer PD test with the bushings fitted measures the assembly; a bushing that was never tested to IEC 60137 can hide a defect that appears as transformer PD. State that bushing and tap changer routine test reports are part of the documentation package, alongside the tests described in the 12-point pre-shipment inspection.
The insulation level you are testing against is not arbitrary: it comes from the system voltage and the impulse level your network specifies, and the temperature class of the solid insulation decides how fast a discharge will eat through it — the letter codes are explained in transformer insulation class A, B, F and H.
Two smaller clauses are worth adding when the unit is critical. Require the PD test to be witnessed or recorded on video with the instrument display visible, since remote witnessing has become normal and the display is the only evidence of the actual reading. And require that any PD failure be resolved by re-test after corrective action, not by re-measurement at a lower voltage — a distinction that sounds pedantic until it is the difference between a rewind and a shipment.
What PD level is normal for a healthy transformer in service?
A healthy oil-immersed unit at 72.5 kV and above typically sits below 10 pC at operating voltage, and often below 5 pC; a healthy cast-resin distribution transformer is usually below 10 pC at 1.1 Um/√3. What matters on site is not the absolute figure but the trend: PD that doubles over six months, or that appears at a voltage where the unit was previously silent, is a defect in progress even at 30 pC. Conversely a stable 50 pC reading with no gas activity, no rise with load and no change over years is usually external noise or a benign artefact, and the correct action is to confirm the measurement, not to schedule a rewind.
The measurement conditions matter as much as the number. PD in oil-paper insulation rises with temperature at constant voltage, so a reading taken on a cold unit and compared with one taken after eight hours at full load will look like a deterioration when nothing has changed. Readings should be compared at similar top-oil temperature, or corrected, and the temperature should be recorded next to the pC value on every survey — the thermal behaviour of the insulation is described in cooling methods and temperature rise.
Baseline PD belongs in the commissioning record, next to the ratio, insulation resistance and winding resistance results, so that every later survey has something to compare against — the full pre-energisation set is in the 8 commissioning checks that prevent a first-switch failure.
Sources / 资料来源
Source: IEC 60270, High-voltage test techniques — Partial discharge measurements.
Source: IEC 60076-3, Power transformers — Insulation levels, dielectric tests and external clearances in air.
Source: IEC 60076-11, Power transformers — Dry-type transformers.
Source: IEC 60137, Insulated bushings for alternating voltages above 1 000 V.
Source: IEEE C57.113, Guide for Partial Discharge Measurement in Liquid-Filled Power Transformers and Shunt Reactors.
Source: IEEE C57.104, Guide for the Interpretation of Gases Generated in Mineral Oil-Immersed Transformers.
Source: GB/T 1094.3, Power transformers — Part 3: Insulation levels, insulation tests and external clearances in air.
Source: GB/T 7354, High-voltage test techniques — Partial discharge measurements.
Source: Duval triangle method, M. Duval, IEEE Electrical Insulation Magazine.
Source: QDTB factory test records and field survey reports, 2020–2026 (industry experience values for cost bands and acceptance levels).