Chlor-Alkali Plant Transformer: How to Size the 35 kV Rectifier Supply for a 200,000 t/y Membrane Cell Plant

Size a 200,000 t/y membrane chlor-alkali plant from its cell current: 960 cells at 20 kA give 24.4 t/h of chlorine, 60.5 MW of DC and 2,481 kWh per tonne, carried by four 18 MVA rectifier transformers rated at 828 V end-of-life, two 90 MVA 110/35 kV units and 24-pulse conversion at 2.6% TDD.

By QDTB Engineering Team·Updated 2026-11-09
Chlor-Alkali Plant TransformerMembrane Cell Rectifier Transformer24-Pulse Rectifier HarmonicsChlorine Plant Power Supply35 kV Rectifier SubstationIEEE 519 TDD ComplianceElectrolyzer DC BusbarConverter Transformer IEC 61378Chlor-Alkali Energy Consumption

The answer first: a 200,000 t/y membrane chlor-alkali plant is a 73 MW load, and the cell current — not the kVA — sets the specification

A 200,000 t/y membrane chlor-alkali plant runs 960 cells in four electrical strings of 240, at 20 kA and 3.15 V per cell. That is 756 V DC and 15.12 MW per string, 60.48 MW of DC power in total, producing 24.4 t/h of chlorine at 96% current efficiency — 73.3 MW and 3,009 kWh per tonne at the 110 kV meter once rectifier losses, auxiliaries and main transformer losses are added. Two 90 MVA 110/35 kV transformers carry it at 45.9% each and 92% of ONAN rating on one unit, four 18 MVA rectifier transformers are rated for the 828 V the cells will need at end of membrane life, and 24-pulse conversion holds total demand distortion at 2.6% against an IEEE 519-2022 limit of 5.0%. The transformer is the least interesting part of the calculation. What decides whether the plant makes money for the next twenty years is that the rectifier must hold 20 kA constant while the cell voltage climbs 9.5%, and that losing one string must cost 25% of output rather than 100%.

Key takeaways

  • Chlorine output is set by current, not by power: 1 kA through a cell produces 1.323 kg of Cl₂ per hour, so 960 cells at 20 kA and 96% current efficiency give 24.4 t/h, or 199,900 t/y at 8,200 operating hours. Energy is set separately by cell voltage: 3.15 V per cell means 2,481 kWh of DC per tonne, a figure no transformer can improve.
  • Four strings of 240 cells at 756 V, not one 60 MW rectifier. A string trip costs 25% of output and the plant keeps running at 18.3 t/h; a single 60 MW unit would shut the cell room down, and 20 kA DC busbars, thyristor voltage class and cell-room layout all point the same way.
  • Two 90 MVA 110/35 kV ONAN/ONAF units at 14% impedance: 45.9% loaded each, 92% of ONAN rating with one out at 45 °C ambient, 27.1 kA of 35 kV fault current and 40 kA switchgear. The 14% impedance is not a purchasing preference — it is what holds the 35 kV fault level inside the switchgear rating.
  • Harmonics are the hidden cost of rectifier duty: 24-pulse conversion plus a 15 Mvar five-branch filter bank gives 2.6% TDD, while the same 60 MW on six-pulse bridges reaches 28–34% TDD and overheats the rectifier transformers years before a relay operates.
  • The electrical package — two main transformers, four rectifier transformers, four thyristor banks, 110 kV and 35 kV switchgear, filters, DC busbars and installation — costs USD 10.4–13.2 million, 3–4% of a USD 300–380 million plant. The rectifier transformers and the 110 kV units sit on the critical path at 24–36 weeks, longer than the electrolyzer frames.

What does a 200,000 t/y membrane chlor-alkali plant actually draw?

Start from the cell room, because in chlor-alkali the electrical load is not a building full of motors that add up — it is one electrochemical process that happens to need a very large direct current, plus the auxiliaries that keep that current useful. The reference plant below is a grass-roots membrane complex in Southeast Asia: 200,000 t/y of chlorine, 225,000 t/y of caustic soda on a 100% basis and 5,600 t/y of hydrogen, 960 membrane cells in four strings, brine from dissolved vacuum salt, chlorine dried on sulphuric acid and liquefied at 3.5 bar, caustic evaporated from 32% to 50% in a mechanical vapour recompression train, and a 110 kV incoming supply from a 1,000 MVA utility node.

Load groupRating (kW)Supply / startingDemand factorDemand (kW)
Electrolyzer strings, 4 × 15.12 MW DC (BOL)60,48035 kV rectifier transformers, 20 kA DC1.0060,480
Brine circulation and filtration1,20010 kV, VFD0.901,080
Caustic circulation and 32–50% MVR2,60010 kV, VFD plus fixed speed0.852,210
Chlorine drying, compression and liquefaction3,40010 kV and 0.415 kV, VFD0.923,128
Hydrogen handling and compression4000.415 kV0.80320
Cooling water pumps and towers1,4000.415 kV, 3 duty + 1 standby0.851,190
Brine treatment, ion exchange and salt handling7000.415 kV0.70490
HVAC, instrument air, lighting, UPS, LV9000.415 kV0.65585
Total connected71,080——69,483

The table deliberately separates the two halves of the load, because they behave in opposite ways. The 60.5 MW of electrolysis is a constant-current load that runs at 100% for 8,200 hours a year and cannot be shed; the 9.5 MW of auxiliary demand follows production and drops by two thirds within an hour of a cell-room shutdown. A load schedule that adds them into one number and applies a single diversity factor will size the transformers wrongly in both directions — the arithmetic is the same one used in the one-step sizing and budget formula — and it will: too small for the rectifiers, because their demand factor is 1.00, and too pessimistic for the auxiliaries, whose simultaneous peak is closer to 0.75 of connected than to 1.0.

The second thing to notice is that the plant's apparent power is not the arithmetic sum of the DC power. At beginning of life the rectifiers run at a displacement power factor of about 0.96 after filtering, the auxiliary motors at 0.86, and the 15 Mvar filter bank sits on the 35 kV bus pulling the plant back to 0.99 at the point of common coupling. At end of membrane life the thyristors fire later, the displacement factor falls to 0.93, and the same plant draws 5% more reactive power for exactly the same tonnage. If the utility tariff has a reactive energy charge — and most do above 0.95 — that 45-month drift in power factor is a recurring invoice, not a commissioning detail.

Salt is the other number that belongs in an electrical article, because it drives the brine circulation load and the salt handling substation. At 1.65 t of NaCl per tonne of chlorine, this plant dissolves 40 t/h of salt, 330,000 t/y, and the brine loop moves roughly 400 m³/h per string through filters and ion-exchange polishers. Nothing in that loop is individually large; together it is 1.9 MW and it is the reason the 10 kV auxiliary board has six feeders instead of two.

How do you turn 25 tonnes an hour of chlorine into 20 kA at 756 V?

This is the calculation that everything else follows from, and it is worth doing from Faraday's law rather than from a rule of thumb, because the two independent variables — current and voltage — are constantly confused in specifications. Current fixes production. Voltage fixes energy. The transformer is sized by the product, but the rectifier is controlled by the first.

The electrochemistry is the chlor-alkali membrane reaction: 2NaCl + 2H₂O → Cl₂ + H₂ + 2NaOH. Two electrons are needed per molecule of chlorine, so one kiloampere flowing for one hour liberates 3.6 MC of charge, which is 18.66 mol of Cl₂, which is 1.323 kg. At 96% current efficiency — the practical figure for a modern membrane cell with a good brine specification — the cell room makes 1.270 kg per kA-hour. A 240-cell string at 20 kA therefore produces 6.10 t/h, and four strings produce 24.4 t/h, which is 199,900 t/y at 8,200 hours.

QuantityValueHow it is derived
Chlorine per kA-hour (100% CE)1.323 kg3,600 s × 1,000 A ÷ (2 × 96,485 C/mol) × 70.9 g/mol
Chlorine per kA-hour at 96% CE1.270 kg1.323 × 0.96
DC current per string20 kACell design: 3.7 m² element at 5.4 kA/m²
Cells per string240Two frames of 120 bipolar elements in series
Cell voltage, beginning of life3.15 VMembrane cell at 5.4 kA/m², 88 °C, 32% caustic
String voltage, beginning of life756 V240 × 3.15 V
String power, beginning of life15.12 MW20 kA × 756 V
Specific DC energy2,481 kWh/t Cl₂15.12 MW ÷ 6.10 t/h, independent of current
Caustic co-product225,000 t/y (100%)1.128 t NaOH per t Cl₂
Hydrogen co-product5,600 t/y0.0282 t H₂ per t Cl₂

The most useful line in that table is the one that does not depend on current. Specific DC energy is cell voltage divided by electrochemical equivalent: 3.15 V ÷ 1.270 kg/kA·h = 2,481 kWh per tonne, whether the plant runs at 10 kA or 30 kA. Current buys tonnes; voltage costs money. This is why a chlor-alkali operator will pay a premium for a membrane with 50 mV lower cell voltage and will not pay anything for a rectifier that can deliver 10% more current, and it is why the rectifier transformer's most valuable specification is not its kVA but its ability to deliver 828 V at year four without exceeding temperature rise.

Note also what the table does not contain: a power factor, a demand factor, or a diversity factor. Those belong to the AC side, where the rectifier, the filter and the auxiliary motors live. Mixing DC electrolysis arithmetic with AC load-schedule factors is the single most common way to end up with a transformer that is 30% too small: a 60 MW DC load is not a 60 MW AC load, and a 0.95 demand factor applied to a cell room that runs flat out for 341 days a year is simply wrong.

Two production ratios are worth memorising because they appear in every feasibility study. Caustic soda is 1.128 t per tonne of chlorine on a 100% basis, so a plant sold as "200,000 t/y of chlorine" also sells 225,000 t/y of caustic and is usually described in the market by its caustic capacity instead. Hydrogen is 0.0282 t per tonne of chlorine, 5,600 t/y here, enough to fire a hydrochloric acid synthesis unit or a small boiler and not enough to justify a generator.

Why four rectifier strings of 240 cells instead of one 60 MW rectifier?

A chlor-alkali cell room is a series circuit, so the number of strings is a design decision about redundancy, DC voltage class and building layout rather than about efficiency. Four strings of 240 cells keep the string voltage at 756 V, which is inside the 900 V class where thyristor rectifiers, DC busbars and cell-to-earth insulation are all standard catalogue items. One string of 960 cells would need 3,024 V DC, a 3 kV rectifier, 3 kV busbar supports, midpoint earthing and a single point of failure worth 200,000 tonnes a year.

ItemPer stringPlant total (4 strings)
Membrane cells in series240 (2 frames × 120)960
DC current20 kA20 kA per string, four independent circuits
DC voltage, BOL / EOL756 V / 828 VSame, per string
DC power, BOL / EOL15.12 MW / 16.56 MW60.48 MW / 66.24 MW
RectifierThyristor, 12-pulse, 20 kA / 900 VFour banks, 4 × 16.5 MW DC
Rectifier transformer18 MVA, 35 kV / 2 × 0.616 kV, Z = 7%72 MVA installed
Phase displacement at 35 kV0°, 15°, 30°, 45°24-pulse equivalent at the busbar
Output at 96% CE6.10 t/h Cl₂24.4 t/h, 199,900 t/y at 8,200 h

The 240-cell frame is also the largest unit that can be shipped and lifted. A bipolar membrane frame of 120 elements is roughly 14 m long, 3 m high and 40 t wet, and it arrives as a complete unit with its own busbars, so the string length is fixed by cell-room logistics before the electrical engineer is consulted. Eight frames in a 60 m × 24 m cell room, four strings, two frames each: that is the layout, and the electrical design follows it.

Redundancy is the second reason, and it is worth being precise about what it buys. Losing one string takes out 25% of production instantly, and the remaining three strings keep running at 20 kA because they are electrically independent. The chlorine liquefaction train turns down to 40% without losing purity, the caustic loop absorbs the imbalance in its 32% storage tanks, and the plant returns to 100% within four hours once the faulty thyristor or cell is bypassed. Losing a single 60 MW rectifier takes out the entire cell room, and a chlor-alkali cell room that has lost its current is not a plant at 0% — it is a plant venting chlorine, purging hydrogen and re-establishing membrane hydration over 24 to 48 hours.

The third reason is current sharing. Four 20 kA circuits are four 20 kA busbar runs, each with 20 kA copper — roughly 20,000 mm² of copper at 1.0–1.2 A/mm² for a naturally cooled indoor run, or four 250 × 20 mm bars per polarity. One 60 MW circuit at 3 kV would still carry 20 kA and gain nothing on busbar, so the only thing the higher voltage buys is a smaller transformer — a saving of perhaps USD 150,000 on 66 MVA of transformer capacity, against the loss of all redundancy. That is not a trade a plant with a 20-year life should make.

What does the 110/35 kV main substation look like, and why 90 MVA?

The plant connects at 110 kV because 73–79 MW cannot be supplied at 35 kV from a typical industrial network without a dedicated feeder and an unacceptable voltage dip on every rectifier start. The utility declares 1,000 MVA of fault level at the point of connection, which is 5.25 kA at 110 kV and 16.5 kA if the same source were seen at 35 kV — the second number is why the 35 kV switchgear rating is decided by the transformers, not by the utility.

EquipmentRatingQuantityRole
110 kV GIS, double busbar145 kV, 31.5 kA / 3 s, 2,000 A2 line bays, 2 transformer bays, 1 couplerDouble-circuit supply, no single utility feeder
Main transformer90 MVA ONAN / 112.5 MVA ONAF, 110/35 kV, Z = 14%, OLTC ±8 × 1.25%2N-1 without load shedding
35 kV switchgear36 kV, 40 kA / 3 s, 2,000 A, double busbar4 rectifier, 2 auxiliary, 1 filter, 1 couplerRectifier and auxiliary distribution
Station service transformer10 MVA, 35/10 kV, Z = 8%2Brine, caustic, chlorine and cooling loads
Earthing transformer and resistor35 kV, 400 A / 10 s1Resistance-earthed 35 kV system, limited earth-fault current
Harmonic filter bank15 Mvar, five tuned branches15th, 7th, 11th, 13th, 23rd; power factor correction

The 14% impedance is the number that makes the switchgear rating work. With 90 MVA at 14%, each transformer contributes 10.6 kA at 35 kV; two in parallel plus the 16.5 kA utility contribution gives 37.7 kA, inside the 40 kA rating with 6% margin. At the more common 10.5% the same transformers would deliver 14.1 kA each and the busbar would see 44.7 kA, which forces 50 kA switchgear, a bigger 35 kV building and a longer delivery. The extra 3.5% of impedance costs about 0.4% of load loss and about USD 60,000 on the two transformers; the switchgear upgrade costs four times that. This is the sort of trade that only appears if the fault study is done before the transformer is ordered.

With one transformer out, the fault level falls to 27.1 kA and the remaining unit carries 82.7 MVA at end of membrane life — 92% of its 90 MVA ONAN rating, 73.5% of its 112.5 MVA ONAF rating. That is the design condition, not the normal one: a 90 MVA ONAN unit at 92% in 45 °C ambient will run a top-oil temperature about 12 K above its full-load value at 20 °C, which is inside IEC 60076-7 limits but eats insulation life — the loading and overload guide gives the ageing arithmetic. The prudent specification therefore asks for ONAF fans on both units from day one, not as an option, because the day one unit fails is the day nobody wants to be installing cooling fans.

The 35 kV system is resistance-earthed through a 400 A, 10 s resistor. Chlor-alkali plants have long cable and busbar runs in a corrosive atmosphere, and a solidly earthed 35 kV system would produce earth-fault currents above 20 kA at every cable joint; resistance earthing holds them at 400 A, keeps the rectifier transformers' delta windings out of the zero-sequence path, and lets the plant ride through a single-phase fault while the faulted feeder is isolated. The cost is that earth-fault protection must be directional and sensitive, typically 20–40 A primary, which is a relay setting exercise rather than a hardware one.

Why is a rectifier transformer not just a distribution transformer?

Six things change when a transformer feeds a thyristor bridge instead of a motor board, and each of them shows up in the price and the delivery time.

Two low-voltage windings with 30° displacement. A 12-pulse rectifier needs two six-pulse bridges fed from a star and a delta secondary. The transformer therefore has three windings — one high-voltage delta and two low-voltage, one in phase and one displaced by 30° — not the two of a distribution unit. The vector group is Dd0y11 — the same displacement logic explained in the vector group guide — and the winding arrangement must keep the impedance between the two low-voltage windings low enough that the two bridges share current within 2%.

Very low secondary voltage at very high current. Each secondary is 616 V line-to-line carrying 16.3 kA RMS at 20 kA DC, which is 0.816 times the DC current for a six-pulse bridge. There is no 16 kA bushing in a distribution transformer catalogue; the low-voltage side is built as sheet windings with copper or aluminium sheet, brought out to large porcelain or epoxy bushings and cabled in air-insulated busbar. The low-voltage winding is also where the harmonic losses concentrate, which is why the design uses a harmonic loss factor rather than a simple K-factor rating.

Impedance chosen for DC fault current. A rectifier transformer's 7% impedance limits the DC-side fault current to about 14 times rated and holds the commutation notch depth within what the 35 kV bus can tolerate. It also sets the voltage regulation between no load and full load: at 7% and 0.96 displacement factor, the DC voltage droops about 4% from no load to 20 kA, which the thyristor control absorbs by reducing the firing angle. Too low an impedance and the DC fault current exceeds the thyristor surge rating; too high and the transformer needs more kVA for the same DC power.

Harmonic losses and DC bias. The current waveform is a rectangular block with commutation shoulders, rich in 5th, 7th and higher orders. Winding eddy losses rise with the square of frequency, so a rectifier transformer of the same kVA as a distribution unit has 15–25% more load loss unless the winding is designed for it. Unequal thyristor firing and the residual DC component from the bridge also put a small DC bias into the core, which is why IEC 61378-1 exists and why the specification should name it rather than IEC 60076-1 alone.

Voltage rating set at end of life, not beginning. The transformer's secondary must deliver 616 V so that the rectifier can produce 828 V DC at 3.45 V per cell, while at beginning of life the thyristors fire at about 25° to bring the DC voltage down to 756 V. Sizing at beginning-of-life voltage is the most expensive mistake in the package: the rectifier would clip at 780 V, the plant would lose 8% of production from year three, and the only fix is a transformer replacement.

Duty cycle and cooling. A chlor-alkali rectifier transformer runs at 100% load for 8,200 hours a year, not at a 60% average with a daily peak. ONAN cooling with a 60 K top-oil rise is acceptable, as the cooling method comparison sets out; ONAF is better because it buys 25% capacity for the end-of-life voltage without changing the core. The unit sits outdoors in a bunded yard with 240 µm of C5-M paint, stainless hardware and IP55 terminal boxes, because a coastal chlor-alkali site is an ISO 9223 category C5 environment and a standard painted tank will be a maintenance item within five years.

ParameterDistribution transformerRectifier transformer, this plant
Rated power2,500 kVA18 MVA
Windings2 (HV + LV)3 (HV delta + LV star + LV delta)
Voltage ratio35/0.415 kV35 ±2 × 2.5% / 2 × 0.616 kV
Secondary current3.5 kA16.3 kA per winding
Impedance6%7%, with 30° inter-winding balance < 2%
Vector groupDyn11Dd0y11
Load loss at 75 °C26 kW (1.04%)200 kW (1.11%) including harmonic factor 1.08
No-load loss3.2 kW25 kW
StandardIEC 60076-1, GB 20052-2020 efficiencyIEC 61378-1 plus IEC 60076-1, -2, -3, -5
CoolingONANONAN/ONAF, 60/65 K rise

One more difference is invisible on a datasheet: a rectifier transformer cannot be fully type-tested with sinusoidal current at its rated kVA and still represent its service condition. IEC 61378-1 handles this by defining equivalent losses and a temperature-rise test at a current that produces the same winding hot-spot, but the practical consequence is that the factory test report matters more than the routine tests. Ask for the harmonic loss measurement and the temperature-rise test with the actual current waveform, not just the standard short-circuit and impulse tests.

What harmonic distortion does a 24-pulse chlor-alkali rectifier create?

A thyristor rectifier is a switched load, and its current is a rectangular block with commutation shoulders. The harmonic orders it produces are fixed by the pulse number: six-pulse bridges produce 5th, 7th, 11th, 13th and so on, twelve-pulse produce 11th, 13th, 23rd, 25th, and twenty-four-pulse push the lowest order up to the 23rd. The amplitude falls roughly as 1/h, but the limit that matters is not the total — it is the individual limit at the 23rd and 25th, which is where a 24-pulse plant discovers that its filter design is not finished.

ConversionLowest characteristic ordersTDD at 35 kV, no filterWith tuned filtersPractical verdict
6-pulse, one bridge per string5th, 7th, 11th, 13th28–34%8–11%Cannot meet IEEE 519; overheats transformers
12-pulse, two bridges at 30°11th, 13th, 23rd, 25th9–12%4.5–5.5%Marginal; fails individual limits at the 11th
24-pulse, four strings at 15°23rd, 25th, 47th, 49th3.5–4.5%2.2–2.8%Compliant with a 23rd branch fitted
This plant: 24-pulse + 15 Mvar, 5 branches23rd, 25th (residual)—2.6% TDD, 23rd at 0.5%Against 5.0% TDD and 0.6% individual

The orders and amplitudes follow the pattern set out in the transformer harmonics guide, with one difference: a rectifier is a current source, not a voltage-driven load. At 35 kV the IEEE 519-2022 limit depends on the ratio of short-circuit current to load current. Here 37.7 kA of fault current against 1,353 A of load current gives Isc/IL = 27.9, which falls in the 20–50 band where the TDD limit is 5.0%. The individual limits in the same band are 4.0% for orders below the 11th, 2.0% for the 11th to 13th, 1.5% for the 17th to 19th, 0.6% for the 23rd to 25th and 0.3% above the 35th. A 24-pulse rectifier without filters typically leaves 1.2–2.0% at the 23rd, so it passes the 5.0% total limit easily and fails the 0.6% individual limit by a factor of three. The filter bank therefore needs a 23rd/25th branch, and the cheapest way to provide it is a high-pass branch tuned at about 23.5, which also shunts the 25th.

The other four branches are not there for the rectifiers. The 5th and 7th branches handle the auxiliary drives — brine and caustic pumps on VFDs, the chlorine compressor and the cooling water fans — and the 11th and 13th branches mop up the residual from unequal firing between the four rectifier banks. Total 15 Mvar in five branches, switched in steps as the plant load falls, raising the plant power factor from 0.96 to 0.99 at the point of common coupling and keeping it above 0.95 when one string is out.

Two details decide whether the filter works or resonates. First, each branch must be detuned below its target order — a "5th" branch tuned at 4.7, a "7th" at 6.7 — so that manufacturing tolerance and frequency drift never bring it to parallel resonance with the 35 kV system. Second, the network impedance must be modelled with the utility's minimum fault level, not its declared maximum: at Isc/IL = 27.9 the parallel resonance between the filter and the source sits close to the 11th, and a plant commissioned at 1,000 MVA that later finds itself on a 600 MVA feeder will see the 11th harmonic amplified rather than absorbed. Ask the utility for the minimum and maximum fault levels and design the filter for the minimum.

One thing harmonic filters do not fix is commutation notches. Every thyristor commutation briefly short-circuits two phases and produces a notch in the 35 kV voltage, and while IEEE 519 limits harmonic current and voltage distortion, a notch of 20–40 µs and 10–15% depth will reset a PLC or an uninterruptible power supply on the same board. The remedy is topological, not financial: feed instrumentation, UPS and control power from a board connected upstream of the rectifier transformers, or from a separate auxiliary transformer with its own feeder, and never from a 0.415 kV board downstream of the rectifiers.

What does 828 V at end of membrane life do to the rectifier rating?

A membrane does not fail suddenly; it degrades. Cell voltage rises by 250–350 mV over the three to four years a membrane lasts, at roughly 1 mV per week in the last year, and the rectifier must deliver that voltage at constant current or the plant loses production before it loses a single cell. This is the single specification that separates a chlor-alkali rectifier package from an industrial one.

At beginning of life, 240 cells at 3.15 V need 756 V, and the thyristors fire at about 24° because the transformer secondary is rated 616 V and the uncontrolled rectifier would produce 828 V. At end of life, 240 cells at 3.45 V need 828 V, the firing angle falls to zero, and the rectifier is at its ceiling. The transformer has been running at 92% of its rating for four years and is now at 100%; the thyristors have been running at a 24° firing angle and are now fully open, which actually reduces their switching losses but removes all control margin. If the utility voltage sags 5% on the day the membranes are at end of life, the DC current falls and the plant loses tonnage — which is why the specification asks for 900 V DC at the rectifier terminals, giving 8.7% of headroom above the 828 V design point.

ConditionCell voltageDC voltsDC currentDC powerFiring anglePlant at meter
Beginning of life, new membranes3.15 V756 V20 kA60.48 MW24°73.3 MW, 3,009 kWh/t
Mid life, 24 months3.30 V792 V20 kA63.36 MW12°76.4 MW, 3,133 kWh/t
End of life, 42 months3.45 V828 V20 kA66.24 MW0°79.4 MW, 3,257 kWh/t

The 248 kWh per tonne difference between the first and last row is the economic case for membrane replacement. At 200,000 t/y and USD 0.06/kWh it is USD 2.98 million a year of extra electricity, against USD 2.0–2.9 million to retube 3,552 m² of membrane — a payback under twelve months. That is why chlor-alkali operators replace membranes on an energy calculation rather than on failure, and why the rectifier's voltage ceiling must match the replacement policy: a plant that intends to run membranes to 3.55 V needs 852 V, not 828 V.

There is a second-order effect that surprises electrical engineers new to the industry. Because the thyristors fire later at beginning of life, the displacement power factor is lower then, not at end of life: 0.96 at 24° falling to 0.99 at 0°. The plant therefore pays its highest reactive power charge in its first year, when the membranes are newest, and the filter bank must be designed for that case. Sizing the filters for the end-of-life condition, which looks like the worst case on a load flow, leaves the plant importing 3–4 Mvar for its first year and paying for it every month.

How does chlorine attack the electrical installation, and where do you put the transformers?

Chlorine is 2.46 times heavier than air, so it accumulates at floor level and in cable trenches rather than dispersing upward, and it is aggressive in the presence of moisture. Dry chlorine below about 120 °C is compatible with carbon steel, which is why it is stored and shipped in steel; wet chlorine attacks almost everything except titanium, nickel alloys, PTFE and PVDF. The electrical design consequence is that the cell room is divided into a dry zone and a wet zone, and the equipment in each is specified differently.

The transformer yard sits outside the cell room, upwind of the chlorine storage and liquefaction area, with the two 90 MVA units separated by a fire wall and each in a bund holding 110% of its oil volume. Nothing about that is chlorine-specific; what is chlorine-specific is the paint system, the terminal boxes and the cooling. A standard ISO 12944 C3 paint job will chalk and blister within three years on a coastal chlor-alkali site, and repainting a 90 MVA transformer in service is a scheduled shutdown, not a maintenance task. Specify C5-M, 240 µm nominal, three coats, with stainless steel hardware and IP55 terminal boxes, and accept the 6–8% price premium.

The rectifier transformers are oil-immersed and outdoors, next to the cell room wall, because an 18 MVA unit at 616 V cannot be built as a dry-type transformer at any sensible price and because the low-voltage bushings need air clearance that a wall-mounted enclosure cannot give. The thyristor banks, by contrast, are indoors in a filtered, positively pressurised electrical room at 50 Pa, with the air intake on the prevailing upwind side and chlorine detection at 0.3–0.5 m above floor level in every room that contains a chlorine source. Alarm at 1 ppm, second alarm and automatic ventilation boost at 3 ppm, and a plant trip with scrubber start above 5 ppm is the sequence most operators use, consistent with a 1 ppm occupational ceiling.

Cable routes need the same discipline. XLPE-insulated cable in galvanised steel tray is standard indoors, but in the wet-chlorine zone the tray becomes FRP or hot-dip galvanised with a PVC coating, aluminium is banned, and cable entries into equipment are sealed with elastomeric glands rather than the usual compression type. None of this is expensive; all of it is invisible on a single-line diagram and therefore routinely omitted from the electrical scope, only to be added as a variation once the contractor sees the cell room.

One more placement decision: the 35 kV switchgear building should be outside the chlorine hazard zone, even if that means 200 m of 35 kV cable. A 40 kA switchgear room inside a zone that can be evacuated for a chlorine release is a room that cannot be worked in during the event that matters most. The cable cost is USD 300,000–500,000; the alternative is a plant that loses its rectifier control room to a gas cloud.

What happens to the plant when one string trips?

The electrical behaviour of a string trip is simple and the process behaviour is not, which is why the transformer specification and the operating procedure have to be written together. Electrically, a 20 kA string that trips removes 15.12 MW of DC load and 66 MVA of the plant's 76 MVA demand in one 60 ms event. The 35 kV bus voltage rises 2–3% for a few seconds before the OLTC and the filter bank respond, the remaining three strings hold their 20 kA because they are independent, and the plant settles at 75% of production, 18.3 t/h.

Process-wise, 75% is a comfortable operating point for everything downstream. Chlorine liquefaction trains normally turn down to 40% without losing purity, the 32% caustic storage — 2,000 m³ in this plant, about 12 hours of production — absorbs the imbalance while the evaporator catches up, and the hydrogen header either keeps sending to the HCl unit or goes to the flare. The real constraint is the chlorine gas holder or the scrubber capacity during the two minutes it takes the liquefaction train to follow the cell room down, and that is a control philosophy issue that the electrical engineer discovers only when the first trip test is done.

A single cell failure is a much smaller event and demonstrates why the series circuit is robust. Bypassing one cell with a copper link removes 3.15 V from the string, so the rectifier reduces its output voltage by 0.42% and the current stays at 20 kA. Production falls by one cell in 960, 0.1%, and the plant continues at full current until the next scheduled shutdown, when the membrane is replaced. A plant that trips a string for a single failed cell is a plant that has not trained its operators; a plant that bypasses it and runs for another six months is behaving normally.

The trip that matters for transformer sizing is the main unit. Losing one 90 MVA transformer takes out two strings, 50% of production, and leaves the other unit at 92% of its ONAN rating carrying 82.7 MVA. The 35 kV bus splits, the tie breaker closes on the healthy section, the auxiliary transformer on the lost section is shed, and the plant runs at 12.2 t/h on two strings. That is a survivable condition for weeks, which is why the N-1 calculation is done at end-of-life voltage and not at nameplate: the plant will spend more of its life at 3.3–3.45 V per cell than at 3.15 V.

What does the electrical package cost and how long does it take?

The numbers below are FOB China ranges for 2025–2026, for the reference plant, excluding the electrolyzer frames, membranes and process equipment. They include factory testing but not sea freight, civil works or the utility connection.

PackageScopeCost (USD million)Lead time (weeks)
110 kV GIS and protection5 bays, double busbar, 31.5 kA, IEC 618501.6–2.020–26
Main transformers2 × 90 MVA, 110/35 kV, Z = 14%, ONAN/ONAF, OLTC2.4–2.930–36
Rectifier transformers4 × 18 MVA, 35/2 × 0.616 kV, Dd0y11, Z = 7%1.0–1.224–30
Thyristor rectifier banks4 × 20 kA / 900 V, 12-pulse, constant-current control1.2–1.520–26
35 kV switchgear8 bays, 40 kA / 3 s, double busbar0.8–1.016–20
Auxiliary supply2 × 10 MVA 35/10 kV, 10 kV switchgear, LV boards0.7–0.916–22
Harmonic filters15 Mvar, five tuned branches, switching and protection0.6–0.818–22
DC busbars and power cables4 × 20 kA DC runs, 35 kV and 10 kV cable0.9–1.212–16
Installation and commissioningErection, testing, protection setting, energisation1.2–1.620–28
Total—10.4–13.136–42 to energisation

Two things in that table decide the project schedule. The first is that both the 90 MVA main transformers and the 18 MVA rectifier transformers take 24–36 weeks, longer than the 20–24 weeks needed for the electrolyzer frames. Ordering the electrolyzers first because they are the biggest line item is the standard way to finish a chlor-alkali project with the cell room erected and no power; the lead time guide explains why that gap is normal rather than unlucky. The second is that the 110 kV utility connection has its own clock — typically 12–18 months for a new substation bay and protection coordination — which means the electrical package must be released before the process design is frozen, on a design basis that will survive the changes.

The operating cost is dominated by losses, and it is worth putting a number on them because it changes the purchasing decision. This package has 1,770 kW of transformer losses at full load — 870 kW in the two main units and 900 kW in the four rectifier transformers — which at 8,200 hours and USD 0.06/kWh is USD 870,000 a year. A supplier offering transformers at 15% higher losses saves perhaps USD 180,000 on the purchase price and costs USD 130,000 a year for twenty years. On a 200,000 t/y plant, the loss evaluation is not a refinement; it is the larger half of the lifetime cost.

How do you size a chlor-alkali supply in six steps?

Step 1 — Fix production and convert it to current. Take tonnes per year, divide by operating hours, divide by 1.323 kg per kA-hour and by the current efficiency. 200,000 t/y at 8,200 h and 96% gives 20 kA. Everything downstream is a consequence of this number, and a 5% error here becomes a 5% error in the rectifier, the busbar and the transformer.

Step 2 — Fix cell voltage and count. Choose the cell design and current density, read the beginning-of-life voltage from the vendor's curve, and divide the target DC voltage by it. 756 V at 3.15 V gives 240 cells per string. Then add the end-of-life voltage — 3.45 V, or 9.5% — and use that for every piece of equipment on the DC side.

Step 3 — Divide into strings by redundancy, not by cost. Four strings of 240 cells give 25% granularity, keep the DC voltage in the 900 V class, and let the plant run at 75% after a trip. One string is cheaper by 3% of the electrical package and removes the plant's only defence against a single thyristor failure.

Step 4 — Size the rectifier transformers at end-of-life voltage. 16.56 MW DC divided by 0.975 rectifier efficiency and 0.9875 transformer efficiency gives 17.2 MVA, so 18 MVA. The secondary is 616 V line-to-line, two windings, Dd0y11, 7% impedance, 16.3 kA per winding.

Step 5 — Do the fault and harmonic study before ordering switchgear. 1,000 MVA of utility fault level plus two 90 MVA transformers at 14% gives 37.7 kA at 35 kV, which sets 40 kA switchgear and confirms the 14% impedance. Isc/IL = 27.9 sets the IEEE 519 band at 5.0% TDD and 0.6% at the 23rd, which sets 24-pulse conversion and a five-branch filter.

Step 6 — Size the main transformers for N-1 at end of life and check the meter. 79.4 MW at 0.96 gives 82.7 MVA, so two 90 MVA units at 45.9% each, 92% of ONAN with one out, and 3,009–3,257 kWh per tonne at the 110 kV meter. The check itself takes a minute with the power system calculators; if the last number is above 3,300, the cell voltage assumption is optimistic and the business case needs revisiting before the transformers are ordered.

What are the seven specification mistakes that cost the most?

1. Sizing the rectifier transformer at beginning-of-life voltage. The plant clips at 780 V, loses 8% of production from year three, and the only remedy is a new transformer with a 30-week lead time. Always specify the DC voltage ceiling first and work back to the secondary voltage.

2. Applying a demand factor to the cell room. A chlor-alkali cell room has a demand factor of 1.00 and runs 8,200 hours a year. Applying 0.9 to 60 MW because "not everything runs at once" undersizes the rectifier by 6 MW and the main transformers by 7 MVA.

3. Buying a transformer on kVA without the harmonic loss factor. A standard 18 MVA unit on rectifier duty runs 15–25% hotter than its nameplate suggests — the same duty that makes a rectifier transformer for an aluminium smelter a different product from a grid transformer, and the failure mode is winding insulation ageing that appears in year six, not year one. Name IEC 61378-1 and ask for the measured harmonic loss.

4. Choosing six-pulse conversion to save rectifier cost. Four six-pulse bridges save USD 200,000–300,000 and produce 28–34% TDD, which cannot be filtered economically at 35 kV and will not be accepted by a utility applying IEEE 519 at the point of common coupling.

5. Leaving the fault study until after the switchgear order. Discovering a 44 kA fault level after ordering 40 kA switchgear forces reactors, a rebuild or a 50 kA replacement. The transformer impedance is the cheapest place to fix it, and it is only available before the order.

6. Specifying a standard paint system and IP54. A C3 paint job on a coastal chlor-alkali site fails within three years, and repainting a 90 MVA unit in service is a shutdown. C5-M at 240 µm and IP55 terminal boxes cost 6–8% more and last the life of the plant.

7. Forgetting the space for a fifth string and for spare thyristors. Cell rooms grow; plants debottleneck from 200,000 to 230,000 t/y by adding cells, not by rebuilding. A cell room laid out with 9 m of clear space at the end and a 35 kV bay reserved costs almost nothing at the design stage and saves a year of construction later.

What changes at 400,000 t/y, or when the grid asks for 132 kV?

Doubling the plant does not double the electrical package, but it changes three things qualitatively. The DC power goes to 121 MW and 1,920 cells, which means eight strings at 20 kA or four strings at 40 kA. Eight strings is the better answer at this scale, because 40 kA DC busbars require water-cooled copper and because eight strings give 12.5% granularity for turndown and maintenance.

The 110 kV connection becomes marginal. At 160 MVA of demand the load current is 840 A, still within a 2,000 A GIS, but the fault level at the point of connection rises and the utility will usually require a 132 kV or 150 kV connection with a dedicated substation. That changes the short-circuit current at the 35 kV bus, and here is the counter-intuitive part: a stronger grid lowers Isc/IL only if the load grows faster than the source. In practice a 400,000 t/y plant on a 2,000 MVA source has Isc/IL of about 18, which drops it into the stricter 10–20 band where the TDD limit is 8.0% but the individual limits tighten to 3.5% below the 11th and 0.5% at the 23rd. Higher pulse numbers or active filters enter the conversation at that point.

Two other things scale badly. The 35 kV bus cannot carry 160 MVA through one section, so it splits into two sections with a bus coupler and each section feeds two strings and one auxiliary transformer. And the membrane replacement economics get better, not worse: at 400,000 t/y the 248 kWh per tonne penalty is USD 5.9 million a year, which justifies replacing membranes at 3.35 V instead of 3.45 V. The rectifier voltage ceiling follows the replacement policy, which is why the specification should be written by the person who owns the operating budget, not only by the person buying the equipment.

What does not change is the arithmetic that matters. Current still buys tonnes, voltage still costs money, and the rectifier transformer is still the only piece of equipment whose voltage rating is decided by a membrane that will be replaced three times over the plant's life. Design the first phase with a spare 35 kV bay, a DC busbar route sized for a fifth string and 9 m of clear floor at the end of the cell room; that costs about 2% of the electrical package and is the only part of the design that is genuinely expensive to change later.

Sources / 资料来源

Source: IEC 60076-1:2011 — Power transformers, General.
Source: IEC 60076-2:2011 — Temperature rise for liquid-immersed transformers.
Source: IEC 60076-3:2013 — Insulation levels, dielectric tests and external clearances in air.
Source: IEC 60076-5:2006 — Ability to withstand short circuit.
Source: IEC 60076-7:2018 — Loading guide for oil-immersed power transformers, emergency loading tables.
Source: IEC 61378-1:2011 — Converter transformers, Part 1: Transformers for industrial applications.
Source: IEC 60909-0:2016 — Short-circuit currents in three-phase AC systems, calculation of currents.
Source: IEC 60038:2009 — Standard voltages, tolerance bands at 35 kV and 110 kV.
Source: IEEE 519-2022 — Recommended practice and requirements for harmonic control in electric power systems, Table 1 current distortion limits for 1–69 kV.
Source: IEEE C57.12.00-2021 and C57.12.90-2021 — General requirements and test code for liquid-immersed transformers.
Source: GB 20052-2020 — Minimum allowable values of energy efficiency and energy efficiency grades for three-phase distribution transformers.
Source: GB/T 6451 — Technical parameters and requirements for oil-immersed power transformers.
Source: ISO 12944 — Corrosion protection of steel structures by protective paint systems, category C5-M for coastal and industrial atmospheres.
Source: ISO 9223 — Corrosion of metals and alloys, corrosivity of atmospheres, classification.
Source: Industry experience — membrane cell voltage of 3.0–3.2 V at 4–6 kA/m², 88 °C and 32% caustic, with a 250–350 mV rise over a three to four year membrane life, 2019–2026.
Source: Industry experience — current efficiency of 95–97% for membrane cells on a well-controlled brine specification, 2019–2026.
Source: Industry experience — salt consumption of 1.60–1.70 t NaCl per tonne of chlorine including brine purification losses, 2019–2026.
Source: Industry experience — thyristor rectifier efficiency of 97–98% and rectifier transformer efficiency of 98.5–99% at full load on 12-pulse duty, 2019–2026.
Source: Industry experience — six-pulse current distortion of 28–34%, twelve-pulse of 9–12% and twenty-four-pulse of 3.5–4.5% TDD at an industrial busbar without filters, 2019–2026.
Source: Industry experience — 110 kV utility fault levels of 800–1,500 MVA for industrial nodes in Southeast Asia and the Middle East, 2019–2026.
Source: Industry experience — transformer, rectifier, switchgear and installation price ranges and 16–36 week lead times for 18–90 MVA units, FOB China, 2025–2026.
Source: Industry experience — industrial electricity tariffs of USD 0.06–0.08/kWh used in the energy and loss calculations, 2025–2026.
Source: QDTB Engineering Team — rectifier transformer specifications, harmonic studies and 35 kV distribution designs for chlor-alkali, electrochemical and industrial plants in Southeast Asia, the Middle East and Europe, 2021–2026.