Greenhouse Grow-Light Transformer: How to Size a 20 kV Supply for 4 ha of LED Lighting — and Why 45 °C, Driver THDi and a 7th-Harmonic Resonance Decide the Specification

How to size a transformer for 4 ha of LED-lit glasshouse: 6,400 kW of grow lights plus 1,262 kW of auxiliaries gives 7,662 kW demand, 7,981 kVA at 0.96 PF and 8,779 kVA with 10% growth, but a 45 °C technical room costs 8% of nameplate and takes a 9,450 kVA substation to 101% loading — so the answer is 3 × 4,000 kVA at 20/0.4 kV, uk 6.5%, Dyn11, at 76% of derated capacity, with 88.8 kA sections, K = 1.61 drivers instead of a K-rated winding, and 1,143 kvar of correction resonating at h = 7.2 without 7% detuned reactors.

By QDTB Engineering Team·Updated 2026-11-18
Greenhouse Grow Light TransformerLED Grow Light Transformer Sizing4 ha Glasshouse Power DemandHorticulture Transformer 20 kVLED Driver Harmonics K-FactorTransformer Derating at 45 °CDetuned Reactor 7th Harmonic ResonanceGrow Light Substation Cost

The answer first: 4 ha of LED grow lights needs 8,779 kVA, and a 9,450 kVA substation cannot legally carry it — order 3 × 4,000 kVA

Four hectares of Venlo glasshouse lit with LED toplighting at 160 W/m2 draws 7,662 kW at full lighting — 6,400 kW of grow lights plus 1,262 kW of pumps, fans, heat pumps and packing hall — which is 7,981 kVA at 0.96 power factor and 8,779 kVA once the 10% expansion allowance is added. The obvious catalog answer, 3 × 3,150 kVA = 9,450 kVA, sits at 92.9% of nameplate and looks adequate. It is not: the transformer room inside the glasshouse runs at 45 °C in July, which costs 8% of nameplate, and the derated capability falls to 8,694 kVA against an 8,779 kVA requirement — 101% loading on a unit that must carry a 16-hour block every day for five months. The answer is 3 × 4,000 kVA at 20/0.4 kV, uk 6.5%, Dyn11, loaded to 73.2% of nameplate and 79.5% of what the 45 °C room leaves, with a sectionalised low-voltage busbar so that one unit out still runs two thirds of the crop. The second finding is the one that saves money: the grow-light drivers, not the transformer, decide the harmonic penalty — a THDi ≤10% driver specification holds the harmonic loss factor at K = 1.61 and removes the need for a K-rated unit, while the cheap alternative puts K at 3.2 and adds 27% to load loss.

Key takeaways

  • Grow lighting is 80% of the load and it is a block load, not a diversified one. All 6,400 fixtures switch on within a few minutes of each other, so the lighting demand factor is 1.00 — there is no diversity to hide behind, unlike a factory where stations peak at different times.
  • 0.20 kVA per m2 of lit area is the sizing rule of thumb for LED toplighting at 160 W/m2 — 2,000 kVA per hectare. It holds within ±12% between 120 and 220 W/m2 because the auxiliary load scales with area too.
  • A 45 °C technical room costs 862 kVA on a 9,450 kVA substation; the same units in an outdoor package station at 40 °C cost only 378 kVA. Moving the substation outside the glasshouse wall is cheaper than the next frame size up.
  • Harmonic loss rises with the square of the harmonic order, so the driver spectrum — not the THD number — sets the winding. At 9% fifth harmonic the fifth alone contributes 0.202 pu of the extra eddy loss, more than the seventh, eleventh and thirteenth together.
  • Power-factor correction is the trap. The 1,143 kvar needed to move 0.96 to 0.99 puts the resonant frequency at h = 7.2, exactly where the drivers place their second-largest current; plain capacitors will fail within a season, 7% detuned reactors move the resonance to h = 3.8.

What does four hectares of lit glasshouse actually draw from the grid?

Protected horticulture is the most electrical-intensive form of agriculture ever built, and the load list is short and brutally concentrated. A 4 ha Venlo house at 40,000 m2 with LED toplighting at 160 W/m2 carries 6,400 luminaires at 1,000 W each — 1,600 fixtures per hectare — and everything else on the site together is a quarter of that.

Load groupConnected kWDemand factorAbsorbed kW
LED toplighting, 6,400 × 1,000 W6,4001.006,400
Irrigation, fertigation and drain-water pumps1800.85153
Climate: vents, screens, circulation fans2400.80192
Active cooling and dehumidification, 4 × 250 kW heat pumps1,0000.75750
CO2 dosing, dosing units, lighting controllers450.6027
Packing hall, cold store, office, workshop2000.70140
Total8,0650.957,662

Two things about that table decide the whole specification. First, the lighting demand factor is exactly 1.00: a greenhouse lighting controller switches sections on a solar-azimuth or DLI trigger, and within four minutes every section is at rate. Second, the auxiliary load is not decoration — a modern climate computer will run the heat pumps and the screens while the lights are on, because 6,400 kW of LED at 2.7–3.2 µmol/J still rejects 3,840 kW of heat into the canopy and that heat has to leave through the vents or the cooling coil before the crop overheats.

The consequence for the transformer is that the peak is flat, wide and coincident. There is no eight-hour shift pattern to exploit, no night-time trough to absorb a cyclic overload, and no station diversity to discount. Whatever the load list says at 20:00 in December is what the transformer carries for 16 hours.

How do you turn 7,662 kW into a transformer kVA rating?

The conversion is three steps, and greenhouses get the third one wrong more often than any other industry.

Step one, power factor. LED drivers with active power-factor correction run at 0.95–0.98; the pumps, fans and heat-pump compressors run at 0.82–0.88. Weighted by the load list above the site power factor is 0.96, so 7,662 kW becomes 7,981 kVA. If the tender specifies induction-motor heat pumps without VFDs the same load becomes 0.91 pf and 8,420 kVA — half a frame size, decided by a mechanical specification nobody thought was electrical.

Step two, growth. Every grower expects to add a lighting section, a second cold store or a supplementary UV/far-red layer within five years. A 10% allowance is the market norm and it is the right one here, because the lighting load grows in 1/8 sections of 800 kW, not in small increments: 8,779 kVA.

Step three, the site conditions that shrink nameplate. This is where 9,450 kVA stops working. IEC 60076-2 rates a liquid-immersed unit for a 40 °C maximum ambient and a 30 °C daily average; a technical room built into the glasshouse wall sees 45 °C for weeks in summer, with the roof surface at 70 °C and no useful night-time cooling because the structure is sealed for CO2 enrichment. At 45 °C the capacity factor is 0.92, so a 9,450 kVA substation offers 8,694 kVA — 1% short of the requirement, and 1% short on the one day of the year when the crop cannot afford a trip. At 50 °C, which is what an unventilated room reaches, the factor is 0.86 and the 9,450 kVA substation offers 8,127 kVA, 7.4% short.

As a cross-check on the arithmetic: 0.20 kVA per m2 of lit area. 40,000 m2 × 0.20 = 8,000 kVA, within 0.3% of the load-list result, and the same rule returns 2,000 kVA per hectare for the 2–20 ha houses that dominate the Netherlands, Spain, Mexico and Morocco.

Why does the load profile — 16 hours on, 8 hours off, five months dark — change the thermal answer?

A grow-light transformer does not see a factory duty cycle. In a Spanish or Mexican latitude the lighting season runs from late September to April, 16 hours a day, with the lights off entirely from May to August. Annual lighting energy is 18.43 GWh (6,400 kW × 16 h × 180 days), which on a 12,000 kVA substation is only 1,739 equivalent full-load hours per year — a load factor of 20%.

That sounds like a licence to undersize, and it is the argument every grower's consultant makes. It is only half right. IEC 60076-7 allows a cyclic loading of 1.3–1.5 pu for a few hours provided the unit cools down afterwards, and the greenhouse qualifies on paper: eight hours of 30% load at 15 °C ambient does recover the hot-spot. What the standard's cyclic tables do not cover is the condition that actually kills grow-light transformers — a 45 °C room, so the unit never returns to its design ambient, and a 16-hour block, so the hot-spot has 16 hours to climb rather than the 4–6 hours the cyclic tables assume. Two of the three preconditions for cyclic rating fail at once.

The practical reading is that the annual load factor justifies a lower loss specification, not a smaller frame. An ONAN unit on a 20% load factor will spend most of its life below 50% load, where no-load loss dominates the energy bill: at 1,739 full-load hours, the difference between a 12,000 kVA unit at 0.10% no-load loss (12 kW) and one at 0.08% (9.6 kW) is 21 MWh a year of pure standby, worth USD 2,500 at 0.12 USD/kWh. Buying the low-loss core is the cheapest decision in the whole project; buying the smaller frame is the most expensive.

Why does 45 °C in a technical room cost 862 kVA while 40 °C outdoors costs 378 kVA?

Because a transformer's rating is a temperature-rise promise, not a power rating. IEC 60076-2 fixes the 65 K average winding rise and 78 K hot-spot rise against a stated ambient; every degree above the reference comes straight out of the kVA you are allowed to sell. The numbers for the three candidate configurations:

ConfigurationNameplate kVAAmbientCapacity factorUsable kVALoad at 8,779 kVA
3 × 3,150 kVA in technical room9,45045 °C0.928,694101.0% — fails
3 × 3,150 kVA in outdoor package station9,45040 °C0.969,07296.8% — no margin
2 × 5,000 kVA in outdoor package station10,00040 °C0.969,60091.4% — no redundancy
3 × 4,000 kVA in outdoor package station12,00040 °C0.9611,52076.2% — recommended
3 × 4,000 kVA, room at 50 °C12,00050 °C0.8610,32085.1% — still works

The table carries two lessons. The 3 × 4,000 kVA choice survives even the worst room, which is why it is the recommendation: it is the only row that keeps a margin in every ambient the site can produce, and it is the only row where losing one unit still leaves 8,000 kVA — enough for two of the three lighting sections and all of the auxiliary load. The 2 × 5,000 kVA row is 18% cheaper and fails on a single contingency: one unit out and the house goes dark, which in a lit crop at 12 °C outside air is not a schedule problem but a quality problem.

Moving the units outside is worth more than it looks. A prefabricated substation to IEC 62271-202 on a concrete plinth outside the gutter line sees ambient air, gets natural convection, and costs USD 8,000–12,000 in enclosure and civil work — against USD 32,000 for the extra frame size that buys the same capacity indoors. The trade-offs between the two arrangements are set out in the package substation versus built room guide, and the general ambient-derating arithmetic is in the altitude and temperature derating guide.

Do LED drivers force a K-rated transformer?

No — and a tender that specifies K-13 by default is spending money in the wrong place. The harmonic loss factor is a property of the current spectrum the drivers produce, and modern horticultural LED drivers with active power-factor correction are mild loads.

Take a compliant driver set: fifth harmonic 9%, seventh 6%, eleventh 3.5%, thirteenth 2.5% of fundamental. That is THDi 11.6%, and the loss factor is K = 1.61. Against a transformer whose eddy-loss share is 12% of load loss, the total load loss rises by 7.3% — on a 12,000 kVA unit that is 1,208 kW of load loss becoming 1,296 kW, a hot-spot shift of about 4 K. Nothing that requires a special winding.

Now price the cheap driver: passive PFC, fifth harmonic 20%, seventh 12%, eleventh 6%, thirteenth 4%. THDi 24.4%, K = 3.22, load loss +27%, hot-spot shift 12–15 K, and the fifth harmonic alone contributes 0.80 pu of the extra eddy loss. A driver without any PFC at all reaches THDi 32%, K = 4.88, +47% load loss. That last case is what UL 1561 K-factor classes are written for, and it is a driver quality problem being solved with a transformer.

Driver specificationTHDiK-factorLoad loss multiplierRight answer
Active PFC, THDi ≤10% (specify this)11.6%1.611.07Standard winding, no K rating
Passive PFC, THDi 20–30%24.4%3.221.27K-4 unit or one frame size up
No PFC, six-pulse front end32.1%4.881.47K-13 unit, and fix the drivers anyway

The commercial logic is blunt. Upgrading 6,400 fixtures from a passive-PFC driver at USD 6 to an active-PFC driver at USD 11 costs USD 32,000 once, and also cuts the lighting circuit current by 10%, which removes 320 A per section from the busbar and one cable size from the feeders. A K-4 12,000 kVA substation costs USD 45,000–60,000 more than the standard unit and does nothing for the current in the cables. The engineering basis for the distinction is in the K-factor selection guide, and the measurement side — what to ask the driver supplier for, and how to read it — is in the harmonics guide.

Why does power-factor correction resonate at the 7th harmonic — and how do detuned reactors fix it?

Most 20 kV supplies in Spain, Mexico, Turkey and Morocco charge for reactive energy below 0.98–0.99 power factor, so the grower's electrical contractor will add capacitor banks. This is the single most common cause of grow-light substation failures, and the arithmetic is unforgiving.

Moving 7,662 kW from 0.96 to 0.99 pf needs 1,143 kvar. The parallel resonance between that bank and the supply inductance sits at h = √(Ssc/Qc), with Ssc = 4,000/0.065 = 61.5 MVA per transformer section: h = √(61,500/1,143) = 7.2. That is 360 Hz on a 50 Hz system — within a few percent of the seventh harmonic, where the driver spectrum carries 6% current. The bank becomes a low-impedance sink at the resonance, current circulates between the capacitors and the transformer, and the capacitors, contactors and fuses fail in the first cooling season.

Two fixes exist and only one is cheap. Detuning the bank with a 7% series reactor moves the tuning frequency to h = 1/√0.07 = 3.78, below the fifth, so the bank is inductive at every harmonic the drivers produce and the resonance never forms; 14% reactors (h = 2.67) are used where the fifth is dominant. The reactors cost USD 18,000–24,000 for 1,200 kvar against USD 6,000 for plain capacitors, and they add 7% to the reactive output that has to be compensated. Alternatively, specify active front-end drivers with unity displacement factor and no capacitor bank at all — then the pf penalty disappears and so does the resonance.

What does not work is the common compromise of 1,800–2,000 kvar of plain capacitors "for margin": that pushes the resonance down to h = 5.9–5.5, straight into the largest harmonic in the spectrum.

Why does 88.8 kA at the 400 V terminals decide the busbar and not the transformer?

A 4,000 kVA 20/0.4 kV unit at uk 6.5% delivers 5,774 A of rated current and 88.8 kA of symmetrical fault current at its terminals — 96.2 kA if the tender specifies uk 6%. Three units on one busbar give 266 kA, which no low-voltage assembly built to IEC 61439 can withstand and no breaker can interrupt. The design answer is not a bigger breaker; it is to never let the three secondaries meet.

Each transformer feeds its own LV section: a 6,300 A main ACB, a 3,200 A busbar run, and eight to ten lighting feeders of 630 A each. Section current is 2,133 kW at 0.96 pf = 3,208 A, so a 3,200 A busbar is at its limit and 4,000 A is the honest choice once cable derating at 40 °C is applied. The three sections are joined by normally-open bus couplers with a mechanical interlock, closed only for maintenance when the upstream transformer is isolated — which is exactly how the N+1 arrangement is operated.

ItemRatingBasis
Transformer4,000 kVA, 20/0.4 kV, uk 6.5%, Dyn11, ONAN8,779 kVA load, 40 °C ambient, N+1
HV current per unit115.5 A at 20 kVRing-main unit 630 A, 3 × 95 mm2 Cu XLPE
LV rated current per unit5,774 AMain ACB 6,300 A, Icu ≥ 100 kA
LV fault current per section88.8 kAuk 6.5%; 96.2 kA at uk 6%
Section busbar4,000 A, 80 kA for 1 s3,208 A section load, 40 °C
Transformer inrush46.2 kA at 8 × InDrives the ACB instantaneous setting; see the inrush guide

The inrush row is not a formality in a greenhouse. Three transformers are energised in sequence after a grid outage, each drawing 46 kA for 0.1 s, while 6,400 LED drivers with capacitive front ends draw their own inrush at the same instant. The ACB instantaneous must be set above the transformer inrush but below the section fault level, and the lighting feeders need C-curve or motor-rated breakers rather than the B-curve devices a residential-minded contractor will install.

What vector group, impedance and tap setting does a grow-light substation need?

Vector group Dyn11 for every unit: a delta HV winding blocks the third-harmonic triplet from the 20 kV network, the earthed star LV winding gives a solid neutral for the 230 V control, dosing and office circuits, and the 30° phase shift is consistent across the three units so they can be paralleled through the coupler for maintenance. Where a grower intends to run two units in parallel permanently, the phase displacement must be identical and the impedance within ±7.5% — the conditions are the same as any other parallel set and are covered in the parallel operation guide and the Dyn11 and Yyn0 vector group guide.

Impedance uk 6.5% is the compromise the LV gear forces. At 6% the fault level is 96.2 kA and the LV boards must be 100 kA rated; at 7% it falls to 82.5 kA but the voltage dip on lighting-section energisation grows. Since the lighting load is resistive and switched in 800 kW blocks, dip is not the governing case for the transformer — motor starting is, and the heat-pump compressors are the only motors that matter. The dip arithmetic for that case is in the motor starting voltage dip guide.

Tapping: off-circuit, ±2 × 2.5%, set at commissioning against a week of measured 20 kV voltage. Greenhouses sit at the end of rural 20 kV feeders, and the annual lighting season coincides with the winter load peak on those feeders, so the measured voltage in January is typically 2–4% below nominal — the tap has to be set on January data, not on the commissioning-day reading in August when the lights are off. Where the utility enforces a ±6% band and the feeder is long, an on-load tap changer is worth its USD 12,000–18,000; the comparison is in the on-load versus off-load tap changer guide.

Why do humidity, sulfur vaporizers and condensation matter more than the IP rating?

A glasshouse is a chemical reactor with 90% relative humidity, and the transformer sits inside it. Three mechanisms attack the unit, and only one of them is about water ingress.

Condensation, not rain. The glasshouse runs at 85–95% RH and 22–28 °C during the lighting season; a transformer that is warm at night and cools after lights-out at 04:00 sits below the dew point for two hours every day. The result is water in the cable box and tracking across the HV bushings, at an installation that never saw a drop of rain. Cast-resin dry-type units handle this well if the enclosure has anti-condensation heaters and the windings are rated for the humidity class; oil-immersed units need a sealed tank with a conservator air bag or a hermetic seal, never an open breather with silica gel that saturates in three weeks.

Corrosive sulfur. Sulfur evaporators are standard practice against powdery mildew in tomato, cucumber and pepper crops, and they raise H2S and SO2 to concentrations that attack the silver-plated contacts and copper of the tap changer and the busbars. IEC 60296 requires the insulating oil to pass the corrosive-sulfur test to ASTM D1275, and the specification must say so explicitly, because the cheapest Chinese and Indian base oils pass the standard test and still corrode in a sulfur-burning house. Silver-plated contacts should be replaced with tin-plated or silver-impregnated graphite in the tap selector.

Ammonia and nitrate. Fertilizer injection and the CO2 dosing system put ammonia in the air, which attacks copper and brass. Cable glands, earthing connections and the LV busbar plating are the exposed surfaces.

The IP rating follows from the location, not from the chemistry: IP54 for a unit inside the glasshouse, IP23 acceptable for a package station outdoors where the enclosure is ventilated and the air is not the house's own. The oil-immersed versus cast-resin decision for this duty — including the fire-load argument that decides it in most European permits — is covered in the oil versus dry-type selection guide, and the temperature-rise and cooling options in the cooling methods guide.

How do 2.5 MWp of rooftop PV and a 1.6 MW CHP change the specification?

A modern lit glasshouse is a power station in its own right, and both distributed sources push current backwards through the same transformer.

2.5 MWp of rooftop PV on the glasshouse roof is 72.2 A at 20 kV and 3,608 A at 400 V — more than half of one 4,000 kVA unit's rating flowing in reverse on a bright May afternoon, when the lights are off and the only forward load is 1,262 kW of auxiliaries. The transformer must therefore be specified for bidirectional power flow, and the protection must include a directional reverse-power element (ANSI 32R) with a definite-time characteristic, plus a neutral current element on the LV side for the inverter's residual current. Reverse flow also decides the tap philosophy: the tap set for January lighting load will over-volt the LV busbar in May, which is why the PV inverter needs a volt-watt or volt-var function set to the actual measured band. The export-path engineering is in the solar PV step-up transformer guide.

A 1.6 MW gas CHP supplying CO2 and heat runs in parallel with the grid at 400 V, 2,309 A, and must never be allowed to island into the glasshouse. Its presence changes two numbers: the transformer's through-fault duty (a CHP holding up the LV busbar extends the duration of a downstream fault) and the earthing design, because a 400 V source with its own neutral point creates a second earth reference unless the CHP neutral is switched or impedance-earthed. In practice the transformer impedance should be checked for the worst case where CHP and grid both feed an LV fault — the combined source can raise the 88.8 kA section fault to 105–112 kA, which is enough to move the LV boards from 100 kA to 120 kA.

What does a grow-light substation cost and how long does it take?

For the recommended configuration, 3 × 4,000 kVA 20/0.4 kV Dyn11 ONAN plus three 20 kV ring-main units and a prefabricated enclosure, FOB China pricing in 2026 sits in these bands. Treat them as budget numbers for a tender, not as a quotation.

ItemBudget FOBLead time
4,000 kVA 20/0.4 kV ONAN, Dyn11, uk 6.5%, copperUSD 38,000–46,000 each10–13 weeks
3,150 kVA equivalentUSD 30,000–36,000 each9–12 weeks
20 kV ring-main unit, 630 A, VCB, 3-wayUSD 4,500–6,000 each8–10 weeks
Prefabricated substation enclosure to IEC 62271-202USD 8,000–12,0006–8 weeks
1,200 kvar detuned capacitor bank, 7% reactorsUSD 18,000–24,0008–10 weeks
Sea freight to Rotterdam or Veracruz, 3 units + enclosureUSD 9,000–14,0005–7 weeks

Three units plus HV switchgear plus enclosure lands near USD 155,000–190,000 FOB, against USD 130,000–155,000 for the 2 × 5,000 kVA alternative. The gap is roughly the value of three days of lit-crop revenue at 4 ha, which is the honest way to frame a redundancy decision. Budget the whole package at 14–20 weeks from purchase order to energisation, with the transformer on the critical path; the timing arithmetic is in the delivery lead time guide and the cost build-up in the sizing and budget formula guide.

What are the seven specification mistakes that show up in grow-light tenders?

  1. Sizing on the lighting nameplate without the lighting controller's actual schedule. A grower who runs 18 hours rather than 16 gains 12% annual energy but no kVA; a grower planning a second lighting layer gains 800 kW of kVA and must be asked, not assumed.
  2. Assuming 40 °C ambient because the datasheet says 40 °C. The datasheet says the unit is rated for 40 °C; it does not say the room is 40 °C. Measure the room in July, or move the unit outside.
  3. Specifying K-13 without asking for the driver spectrum. The K rating is a consequence of the driver specification; buying it instead of writing it costs USD 45,000–60,000 and fixes nothing in the cables.
  4. Plain capacitor banks for the pf penalty. 1,143 kvar resonates at h = 7.2 and fails within a season. 7% reactors, or active front ends, or nothing.
  5. Forgetting that the lighting load switches in 800 kW blocks. Section energisation, driver inrush and transformer inrush arrive together; the protection must be set for the combination, not for each in isolation.
  6. Treating PV and CHP as someone else's package. Both push current through the transformer and both change fault level, protection and tap philosophy; the transformer specification has to be written after the energy concept, not before.
  7. Ignoring the corrosion chemistry. A standard oil-immersed unit with a silica-gel breather in a sulfur-burning house will fail its first DGA test at year three. Sealed tank, corrosive-sulfur-tested oil, tin-plated contacts.

Quick answers to the questions greenhouse engineers actually ask

Can I use one big transformer instead of three? You can, and it will be cheaper by USD 20,000–30,000. It will also put 266 kA on a single LV busbar, which no IEC 61439 assembly will take, and it will take the entire crop down on a single fault. Granularity here is bought for fault level and redundancy, not for capacity.

160 W/m2 of LED — is that not more than HPS needed? HPS installations ran at 190–240 W/m2 for the same daily light integral; LED at 2.7–3.2 µmol/J reaches it at 140–170 W/m2. A retrofit from HPS therefore reduces the lighting kVA by 25–30% and increases the harmonic content — the transformer gets smaller and the harmonic question gets bigger, which is the opposite of what most retrofits assume.

Do I need a separate transformer for the cold store and packing hall? Not for capacity, but consider it for reliability: the packing hall runs in summer when the lighting is off, so a dedicated 630–1,000 kVA unit lets you keep the three lighting units de-energised for eight months and save their no-load loss. At 12 kW each and 5,800 idle hours, that is 209 MWh a year — worth more than the extra unit.

What about the noise limit? A 4,000 kVA ONAN unit runs at 62–68 dB(A) at 1 m; glasshouse sites are usually in rural areas with a 45 dB(A) night limit at the property boundary, so the package station must be sited 30–50 m from the boundary or fitted with a low-noise radiator. The calculation is in the noise level specification guide.

Where can I run these numbers for a different area or wattage? The kVA scales as 0.20 kVA/m2 at 160 W/m2 and linearly with the lighting wattage above 120 W/m2; the derating, harmonic and fault arithmetic does not change. The open calculators at QDTB power system calculators take a load list and return kVA, fault level, voltage dip and a bill of materials; the general voltage-class decision for 6.6, 11, 20 and 33 kV supplies is in the voltage class selection guide, and the protection package that goes with this substation is in the protection devices guide.

Sources / 资料来源

Source: IEC 60076-1 — Power transformers, general requirements.
Source: IEC 60076-2 — Temperature rise for liquid-immersed transformers, ambient reference and capacity factors.
Source: IEC 60076-7 — Loading guide for oil-immersed power transformers, cyclic loading and insulation ageing.
Source: IEC 60076-5 — Ability to withstand short circuit.
Source: IEC 60076-11 — Dry-type power transformers, humidity and environmental classes.
Source: IEC 60296 — Fluids for electrotechnical applications, mineral insulating oils, corrosive sulfur requirements.
Source: ASTM D1275 — Standard test method for corrosive sulfur in electrical insulating oils.
Source: IEC 62271-202 — High-voltage/low-voltage prefabricated substations.
Source: IEC 61439-1 and IEC 61439-2 — Low-voltage switchgear and controlgear assemblies, verified design and temperature-rise limits.
Source: IEEE 519-2014 — Recommended practice and requirements for harmonic control in electric power systems.
Source: IEEE C57.110 — Establishing transformer capability when supplying nonsinusoidal load currents, harmonic loss factor.
Source: UL 1561 — Dry-type general purpose and power transformers, K-factor classification.
Source: UL 8800 — Horticultural lighting equipment, luminaire safety.
Source: Industry experience — LED toplighting installed density of 140–170 W/m2 and 1,400–1,700 fixtures per hectare for Venlo-type glasshouses at 2.7–3.2 µmol/J efficacy, 2019–2026.
Source: Industry experience — lighting schedules of 16–18 h/day for 170–190 days per season in Spain, Mexico, Morocco and Turkey, and 2,600–3,400 full-load hours per year in Dutch lit cultivation.
Source: Industry experience — driver harmonic spectra: active PFC at THDi 8–12%, passive PFC at 20–30%, six-pulse front ends at 30–35% without DC-link choke, 2019–2026.
Source: Industry experience — technical-room temperatures of 42–50 °C in glasshouse-integrated substations against 30–38 °C in outdoor package stations at the same site, 2019–2026.
Source: Industry experience — FOB China price ranges for 3,150–5,000 kVA 20/0.4 kV ONAN transformers, 20 kV ring-main units, prefabricated substations and 1,200 kvar detuned banks, 2025–2026.
Source: QDTB Engineering Team — transformer specifications and 20 kV distribution designs for lit horticulture and agri-processing sites in Spain, Mexico, Turkey and Morocco, 2021–2026. The lighting-driver inrush and breaker-curve arithmetic is in the inrush current guide, and the short-circuit calculation behind the 88.8 kA figure is in the short-circuit current guide.