Product Search
Find the right transformer for your needs
PCS-HV Series — High-Voltage Grid-Forming Converters
5 Models available · PCS Power Conversion Systems
High-voltage PCS from 50 to 500 kW drive containerised and utility storage, offering high efficiency, fast response and full grid-forming capability.
Model Number Breakdown
- 750 V+ DC input
- Grid-forming and black-start
- 98 %+ efficiency
- Utility grid-code compliance

Specifications Range
All specifications and dimensions can be customized upon request
| Key parameters | Model Range |
|---|---|
| Rated Power | 50–500 kW |
| DC Voltage Range | 600~1000, 900~1500 |
| AC Voltage | 380 V, 480 V |
| Max Efficiency | 98.5–99 % |
| Topology | Three-level bidirectional |
| Protection Level | IP54 |
⚙How It Works
The high-voltage PCS pairs a 750 V+ battery cluster with the grid, running the bidirectional conversion at high DC voltage to keep current low and efficiency above 98 %. At the 50–500 kW scale the PCS-HV becomes the power-electronics heart of containerised and utility storage, providing fast charge/discharge, grid-forming black-start and full grid-code compliance for frequency and voltage support.
▦Structure & Composition
The PCS-HV uses a three-level NPC or SiC bridge for lower switching loss at high power, a high-DC input stage with pre-charge and insulation monitoring, an output filter and an integrated cooling system. Redundant auxiliary supplies and a serviceable rack layout support 24/7 operation, and dual communication paths (CAN + Ethernet/Modbus) tie it into the plant SCADA and EMS.
Model Range
| Model | Rated Power | DC Voltage Range | AC Voltage | Max Efficiency | Topology | Reference Price |
|---|---|---|---|---|---|---|
| QD-PCS-50 | 50 kW | 600~1000 | 380 V | 98.5 % | Three-level bidirectional | … |
| QD-PCS-100 | 100 kW | 600~1000 | 380 V | 98.5 % | Three-level bidirectional | … |
| QD-PCS-125 | 125 kW | 600~1000 | 480 V | 98.5 % | Three-level bidirectional | … |
| QD-PCS-250 | 250 kW | 900~1500 | 480 V | 99.0 % | Three-level bidirectional | … |
| QD-PCS-500 | 500 kW | 900~1500 | 480 V | 99.0 % | Three-level bidirectional | … |
Applications
Selection Guide
- Containerised BESS, frequency regulation and utility storage of 50–500 kW per unit.
- Verify the DC voltage window against the battery cluster before sizing the PCS.
- Use grid-forming units for microgrids; grid-following units suffice for grid-tied peak shaving.
Frequently Asked Questions
What is the efficiency of the high-voltage PCS?
Peak efficiency exceeds 98 %, with three-level or SiC stages keeping switching loss low at high power.
Can one PCS run both grid-tied and off-grid?
Yes, it switches between grid-following and grid-forming operation based on system state.
How does the PCS talk to the BMS?
Over CAN and Modbus, exchanging state-of-charge, charge/discharge limits and protection status with the battery.
Instant Selection & Quote Calculator
Select your specifications to get an estimated price instantly.
| Base price (interpolation) | $415 |
| × Product factor | ×1.0000 |
| × Country factor | ×1.0000 |
| × Copper-linked factor | ×1.0000 |
| + Options / accessories | $0 |
Complete equipment — no winding copper linkage
Reference prices are for estimation only and do not constitute a formal offer.
We will reply with your latest quote instantly.
Solar System Configurator
Size your solar array, storage and balance-of-system, and get an instant bill of materials.