QDTB® Transformer

Diesel Power Station Calculator

Enter your continuous load and duty to size the genset units at ~75% load (with N+1), the ATS, fuel tank and enclosure — plus daily fuel OPEX and a complete BOM.

Start Calculating Calculators

How a diesel station is sized

Diesel gensets run best at 70–80% load. The calculator picks a standard unit (500–2000 kVA) so the running sets sit at ~75% load, adds an N+1 standby set, and sizes the ATS, fuel storage and 20/40 ft enclosure from your autonomy days.

1200 kW Prime Diesel Station (Containerised, N+1)

Example 1 — 1200 kW Prime Diesel Station (Containerised, N+1) · FOB $6,480
Diesel power station · prime
2500 kVA
5 × 500 kVA (4 running + 1 standby) · container
Fuel tank
21,600 L
Fuel OPEX
$270/h
Est. BOM (FOB)
POA
📦 Bill of Materials
EquipmentModelSpecQty
Diesel generator sets500 kVA × 54 running @ 75% load + 1 standby (N+1) · prime duty · ISO 85285
Paralleling control cabinet5 × 500 kVAsynchronising + GB load-sharing · PLC control1
Paralleling secondary wiringcontrolsynchroniser, governor & AVR interconnections (并机二次线)1
ATS (grid ↔ genset)3608 Aautomatic transfer switch · mains-to-backup changeover1
Busbar bridgeLVparalleling busbar bridge (母线桥) · copper busbar system1
Enclosure20 ft containercontainerised genset · weatherproof1
Fuel day tank + transfer pump21600 Lday tank + fuel transfer pump (3 days autonomy @ 7200 L/day)1
Fuel piping & valvesoil linebulk storage → day tank piping + valves + filters (油路阀件)1
Exhaust systemsilencerresidential/urban grade silencer + exhaust pipe + stack (排烟系统)1
Intake / exhaust ventilationventilationcombustion air + radiator cooling airflow (进排风系统)1
Fire suppression (gas)gasclean-agent gas suppression for container/machine room (消防气体灭火)1
Anti-vibration mountings & foundationcivilspring mountings + concrete plinth (基础减振)1
Power cablesLVgenerator leads + feeder cables (动力电缆分段)1
Control & instrument cablescontrolcontrol / protection / monitoring cabling (控制电缆分段)1
Earthing & lightning protectiongroundingstation grounding grid + lightning rods + SPD1
EMS interface cabinetEMSenergy management / SCADA interface (EMS 接口柜)1
Summary
Estimated total (FOB Qingdao, EXW) — priced equipmentPOA
📐 Single-line diagram (circuit-level)
MODULAR SINGLE-LINE DIAGRAM10 kV / 0.4 kV · 3-phase · 2500 kVA · hybrid · schematicGRIDGRIDDGDG x5EMS + ATShybrid energy management + transfer10 kV MV BUSTRANSFORMER2500 kVA0.4 kV LV BUSPARALLELING CAB5 x 500 kVACritical load 1 · 451 ACritical load 2 · 451 ACritical load 3 · 451 ACritical load 4 · 451 ACritical load 5 · 451 ACritical load 6 · 451 ACritical load 7 · 451 ACritical load 8 · 451 ALEGENDQFcircuit breakerCTcurrent transformerTtransformerSPDsurge arresterPFCpower-factor correctionDESIGN DATAincoming 10 kVbus 0.4 kVLV switchgear 5 x 500 kVAno PFCfeeders 8SECONDARYBASIC · MODBUSSchematic / feasibility-level design construction drawings by a licensed design institute.
⚙️ Diesel paralleling single-line (gensets → cabinet → bus → ATS → load)
DIESEL PARALLELING SINGLE-LINEgensets -> paralleling cabinet -> bus -> ATS -> load (schematic)G1500 kVA.../5AG2500 kVA.../5AG3500 kVA.../5AG4500 kVA.../5AParalleling bus · 2500 kVA totalATS3608 AGridutilityCritical loadprime · container
LEGENDBreaker (52)CT (current transformer)50/51Protection relaykWhMeter (kWh)SPD (surge protection)
🗄 Container layout (gensets / day tank / silencer positions)
CONTAINERISED DIESEL STATION EQUIPMENT LAYOUT (GA)simplified general arrangement - dimensions indicativeSUBSTATION ROOM / PAD (schematic)GENSET 1GENSET 2DAY TANKSILENCEREXHAUSTCTRL CABATS20 ft container containergensets, day tank, silencer & control cabinet dimensions indicative
EQUIPMENT SCHEDULEItemEquipmentSpecification1Genset5 x 500 kVA2Paralleling cabsync + load-share3ATS3608 A4Day tank21600 L5Silencer + exhaustcritical-grade6Control cabinetprotection + SCADA7Ventilationcombustion + radiator
⛽ Fuel oil system (bulk tank → transfer pump → day tank → engine supply + return)
FUEL OIL SYSTEMbulk storage tank -> transfer pump -> day tank -> engine supply (with return + level + valves, schematic)BULK STORAGE64800 Llevel gaugeV1 gateTRANSFER PUMPunloading + feedDAY TANK21600 Llevel gaugeV2 gateoverflow / return to bulksupply mainengine supplyENGINE FUEL RAIL (supply manifold)G1G1fuel inletG2G2fuel inletG3G3fuel inletG4G4fuel inletFUEL RETURN LINE (back to day tank)return (dashed) + overflow (top) schematicFUEL DATADay tank21600 LConsumption7200 L/dayAutonomy3 daysFuel rate0.25 L/kWhFuel system is schematic / indicative tank sizes, pump duty and piping per site fire & fuel codes.
🛡 Earthing system (TN-S: electrodes / main bar / equipotential bonding)
EARTHING SYSTEM (TN-S)earth electrodes / main earthing bar / equipotential bonding PE and N separated (schematic)GENSET 1containerbondGENSET 2containerbondGENSET 3containerbondGENSET 4containerbondPE MAIN EARTHING BAR (earthing main)EQUIPOTENTIAL BONDINGN NEUTRAL BAR (separate from PE, TN-S)R1R2R3R4R5R6GROUNDING DATAEarth rods: 6 x dia 16 mm x 2.5 m copper-bonded steel · ring electrode · target <= 4 ohmStandard: IEC 60364 (TN-S) / IEEE 80 / GB-T 50065 · equipotential bonding of every metallic enclosureEarthing layout is schematic / indicative verify soil resistivity and measure the final earth resistance on site.
🎛 Genset control sequence & interlock (start / idle / ramp / sync / close / trip)
GENSET CONTROL SEQUENCE & INTERLOCK (SECONDARY)start -> idle -> ramp -> synchronise -> close -> protection trip (sequence + interlock contacts, schematic)STARTSTARTcrank commandIDLEIDLEidle solenoidRAMPRAMPgovernor rampSYNCSYNCANSI 25 checkCLOSE 52CLOSEclose coilTRIPTRIP86 lockoutINTERLOCK / PERMISSIVE CONTACTS:start enablewarm-up timervoltage/freq okphase match + dV/df52b (open)prot relay 50/51/86PROTECTION TRIP CHAIN50/5186lockout relay (86) latches52 trip (open)Overcurrent/earth-fault (50/51) energises the 86 lockout relay,which trips and locks out 52 until manually reset.SYNCHRONISATION (ANSI 25)dVdfphidVdfphaseAuto-synchroniser matches voltage, frequency and phaseangle before issuing the close command to 52.Sync-check relay blocks close on phase mismatch.Control sequence is a typical scheme (project detailing required for wiring, terminal assignment and settings).
🔁 Synchronisation & paralleling principle
ParameterValue
Sync checkauto-synchroniser matches V, f, phase before close (ANSI 25)
Active (kW) sharingisochronous governor + load-share lines
Reactive (kvar) sharingAVR droop / cross-current compensation
Buscommon paralleling bus · 2500 kVA total
⚖️ Load sharing strategy
ParameterValue
Running units4 @ ~75% load
Standby (N+1)1 unit(s)
Actual load factor60% (with standby)
Overload responsePLC sheds non-critical feeders
⛽ Fuel consumption calculation
ParameterValue
Specific consumption0.25 L/kWh @ 75% load
Hourly fuel300 L/h
Hourly cost$270/h @ $0.9/L
Daily fuel7200 L/day
Tank volume21600 L (3 days)
🗄 Container / layout description
ParameterValue
Enclosure20 ft container · container
Contentsgensets + day tank + silencer + control cabinet + ATS
Ventilationcombustion air + radiator cooling airflow
Fire protectionclean-agent gas suppression
🔇 Noise attenuation scheme
ParameterValue
Enclosureacoustic container / machine room
Attenuatorsinlet + outlet air attenuators
Exhaustcritical-grade silencer on stack
Target≤75 dB(A) @ 1 m (residential ≤65 dB(A))
🗓 Maintenance schedule (typical)
ParameterValue
Oil + filter changeevery 500 h
Fuel filterevery 500 h
Air filterevery 1 000 h
Coolantevery 2 000 h / annual
Battery checkmonthly
Major overhaul15 000–30 000 h
📏 Standard basis (依据标准)
TopicStandard
Genset ratingISO 8528 — reciprocating internal combustion engine driven generating sets
Chinese equivalentGB/T 2820 — 往复式内燃机驱动的交流发电机组
GeneratorIEC 60034 — rotating electrical machines
Genset classificationGB/T 4712 — classification of AC generating sets
🧮 How it was calculated
1. Apparent load = 1200 kW ÷ pf 0.8 = 1500 kVA
2. Unit sizing at 75% load: 1500 kVA ÷ 0.75 = 2000 kVA → standard unit 500 kVA
3. Running units = ceil(1500 ÷ 375) = 4 · +1 standby (N+1)
4. Total installed = 5 × 500 = 2500 kVA (actual load 60%)
5. Fuel = 1200 kW × 0.25 L/kWh = 300 L/h → 7200 L/day → tank 21600 L (3 days)
6. Fuel OPEX ≈ 300 L/h × $0.9/L = $270/h ($6480/day)
📋 Design notes
Synchronisation & paralleling: Each genset closes onto the common bus through an auto-synchroniser that matches voltage, frequency and phase angle before the breaker closes (sync check relay ANSI 25). After paralleling, isochronous governors share active load (kW) and AVR droop sharing balances reactive load (kvar).
Load factor: Diesel gensets run most efficiently and with least wet-stacking at 70–80% load. The unit count is sized for ~75% load per running set; N+1 adds a standby set for maintenance rotation and peak redundancy.
Load sharing strategy: Active (kW) load sharing via isochronous governor + load-share lines; reactive (kvar) sharing via cross-current compensation or droop. The PLC/GB cabinet arbitrates start/stop sequencing and sheds non-critical feeders on overload.
Duty class: Prime duty: continuous rated output, unlimited hours. Duty class affects permissible load and service interval.
Pricing basis: Genset priced per unit from the diesel-generators reference (FOB Qingdao); ATS from ats-transfer-switches. Paralleling cabinet, enclosure/container, fuel system, cabling, silencing and civil works are quoted per project (POA).
Fuel estimate: Fuel consumption assumes ~0.25 L/kWh at 75% load (typical 180–220 g/kWh, diesel density 0.84). Fuel price $0.9/L is illustrative; confirm local delivered price.
Noise attenuation: Containerised sets target ≤75 dB(A) at 1 m via acoustic enclosure + inlet/outlet attenuators; residential/urban sites may require ≤65 dB(A) and a critical-grade silencer on the exhaust stack.
Design review: This is a preliminary sizing. A licensed engineer must verify short-circuit rating, synchronising controls, ventilation and exhaust routing, and local emissions/noise regulations.

How it was calculated

Core formulas

Apparent load = kW ÷ 0.8 (pf). Running units = ceil(kVA ÷ (0.75 × unit kVA)). Fuel ≈ 0.25 L/kWh at 75% load; tank = daily fuel × autonomy days.

Applicable standards

ISO 8528 (generating sets), GB/T 2820, IEC 60034 (generators), GB/T 4712 (classification).

Frequently asked questions

How many gensets do I need?

The calculator keeps each running set at ~75% load (best efficiency, least wet-stacking) and adds one standby set under N+1 for maintenance rotation and peak redundancy.

Containerised or machine-room?

Containerised is a factory-assembled, weatherproof 20/40 ft package that ships and commissions fast. A machine room needs civil works but suits very large or permanently-installed stations.

How is the fuel tank sized?

From ~0.25 L/kWh at 75% load: daily consumption × your autonomy days. The calculator reports both daily consumption and tank volume.

Which items are priced in the BOM?

Gensets (per-unit) and the ATS are priced from the catalogue. The paralleling cabinet, enclosure/container, fuel system, cabling, silencing and civil works are quoted per project.

Embed this calculator

Copy the iframe code below to embed this calculator on any site. The embed page is noindex and fits any width.

Related calculators

Results are engineering estimates for reference. Final design must be confirmed by a licensed local engineer against site conditions and applicable codes. Prices are FOB Qingdao (EXW) and do not include freight, duty or installation.

Send my complete design report

Get the full bill of materials, single-line diagram, calculation steps and FOB pricing as a PDF — free, no sign-up.

💬 Chat on WhatsApp

Your data stays private. No spam — only a reply to your enquiry.